Final inspection completed, awaiting project closure
MH SAROFIM PAVILION LEVEL 05 BURN is a Renovation/Alteration project located at 6411 FANNIN, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $900K covering 2,600 sq ft. MEMORIAL HERMANN HOSPITAL is the property owner and PAGE SOUTHERLAND PAGE, INC. is the design firm of record. The project was registered with TDLR on September 20, 2024.
MH SAROFIM PAVILION LEVEL 05 BURN is a renovation/alteration project at 6411 FANNIN, Houston, TX 77030 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Convert 4 exist. ISO rooms mechanical in ceiling to pos. air and 2 exist. patient rooms mechanical in ceiling to neg air. No change to exist accessibility except wardrobe closet.
Construction on MH SAROFIM PAVILION LEVEL 05 BURN is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
MH SAROFIM PAVILION LEVEL 05 BURN is located at 6411 FANNIN, Houston, TX 77030, Houston, TX, 77030, in Harris County.
MEMORIAL HERMANN HOSPITAL is the property owner/developer of record for MH SAROFIM PAVILION LEVEL 05 BURN, per its TDLR project registration.
PAGE SOUTHERLAND PAGE, INC. is the design firm of record for MH SAROFIM PAVILION LEVEL 05 BURN, according to its TDLR filing.
MH SAROFIM PAVILION LEVEL 05 BURN has an estimated construction value of $900K and approximately 2,600 square feet (about $346/sqft), based on its TDLR filing.
Convert 4 exist. ISO rooms mechanical in ceiling to pos. air and 2 exist. patient rooms mechanical in ceiling to neg air. No change to exist accessibility except wardrobe closet.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 20, 2024
Review Complete
Sep 20, 2024
Inspection Complete
Feb 3, 2026
Closed
501d
Construction phase