Crust Pizza
Crust Pizza is a renovation/alteration project at 145 South Brook Dr Suite 180, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2025). The project has an estimated value of $400K across about 2,390 sq ft.
๐Project Metrics
TDLR #TABS2025001604Inspection Complete
Final inspection completed, awaiting project closure
Crust Pizza is a Renovation/Alteration project located at 145 South Brook Dr Suite 180, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $400K covering 2,390 sq ft. OP III Leander Michelle Tract, LP is the property owner. The project was registered with TDLR on September 23, 2024.
โFrequently Asked Questions
What is Crust Pizza?
Crust Pizza is a renovation/alteration project at 145 South Brook Dr Suite 180 in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build-out of restaurant within an existing shell retail building.
Is Crust Pizza open in Leander?
Construction on Crust Pizza is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2025. The building is finished and very likely open.
Where is Crust Pizza located?
Crust Pizza is located at 145 South Brook Dr Suite 180, Leander, TX, 78641, in Williamson County.
Who is the owner or developer of Crust Pizza?
OP III Leander Michelle Tract, LP is the property owner/developer of record for Crust Pizza, per its TDLR project registration.
How much does Crust Pizza cost and how big is it?
Crust Pizza has an estimated construction value of $400K and approximately 2,390 square feet (about $167/sqft), based on its TDLR filing.
๐Scope of Work
Interior build-out of restaurant within an existing shell retail building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 23, 2024
Review Complete
Inspection Complete
Jul 31, 2025
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Main panel change-out
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
Harrell - 39-65378 - Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only.
Harrell - 39-65378- Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. requesting wire pull
Replacement of an existing water heater Navien 240A2 tankless gas water heater Located in in 2nd floor attic