Construction complete ยท Dec 2025โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Prime IV Hydration and Wellness SPA

145 Southbrook Dr., Suite# 130, Leander, TX 78641, Leander, TX, 78641

Prime IV Hydration and Wellness SPA is a new construction project at 145 Southbrook Dr., Suite# 130, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2025). The project has an estimated value of $270K across about 1,680 sq ft.

Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #TABS2025017659
$270K
Project Value
1,680
Square Feet
$161/sqft
Cost/SqFt
3 months
Duration
Registered:Apr 28, 2025
Start:May 15, 2025
Target:Aug 15, 2025
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

Prime IV Hydration and Wellness SPA is a New Construction project located at 145 Southbrook Dr., Suite# 130, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $270K covering 1,680 sq ft. OP III Leander Michelle Tract, LP is the property owner and B R Design is the design firm of record. The project was registered with TDLR on April 28, 2025.

โ“Frequently Asked Questions

What is Prime IV Hydration and Wellness SPA?

Prime IV Hydration and Wellness SPA is a new construction project at 145 Southbrook Dr., Suite# 130 in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1680 sq ft (new construction in shell unit) i.e. hvac, mep and everything else.

Is Prime IV Hydration and Wellness SPA open in Leander?

Construction on Prime IV Hydration and Wellness SPA is complete โ€” TDLR records show the project passed its required accessibility inspection in Dec 2025. The building is finished and very likely open.

Where is Prime IV Hydration and Wellness SPA located?

Prime IV Hydration and Wellness SPA is located at 145 Southbrook Dr., Suite# 130, Leander, TX, 78641, in Williamson County.

Who is the owner or developer of Prime IV Hydration and Wellness SPA?

OP III Leander Michelle Tract, LP is the property owner/developer of record for Prime IV Hydration and Wellness SPA, per its TDLR project registration.

Who is the architect or design firm for Prime IV Hydration and Wellness SPA?

B R Design is the design firm of record for Prime IV Hydration and Wellness SPA, according to its TDLR filing.

How much does Prime IV Hydration and Wellness SPA cost and how big is it?

Prime IV Hydration and Wellness SPA has an estimated construction value of $270K and approximately 1,680 square feet (about $161/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

1680 sq ft (new construction in shell unit) i.e. hvac, mep and everything else.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
April 28, 2025
Review Complete
+223d
April 28, 2025
Inspection Complete
December 7, 2025
Construction Start
May 15, 2025
Expected Completion
August 15, 2025

๐Ÿ“…Project Timeline

Filed

Apr 28, 2025

Review Complete

Apr 28, 2025

Inspection Complete

Dec 7, 2025

Closed

223d

Construction phase

๐Ÿ“„Related City Permits

Building permits found at or near this location

14509 DEAF SMITH BLVD

Main panel change-out

FinalElectrical PermitUpgradeJun 2026
View Details
2026-074698 EP
๐Ÿ”งRadiant Plumbing and Air Conditioning
14524 BANBRIDGE TRL

Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System

ActiveMechanical PermitChange OutJun 2026
View Details
2026-072256 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
14533 DONALD DR

Harrell - 39-65378 - Install new 3.8 kW rooftop solar system to existing residential only using backfed breaker only.

FinalElectrical PermitAuxiliary PowerMay 2026
View Details
2026-053893 EP
๐Ÿ”งPower Home Remodeling
14533 DONALD DR

Harrell - 39-65378- Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. requesting wire pull

FinalElectrical PermitUpgradeMay 2026
View Details
2026-054068 EP
๐Ÿ”งPower Home Remodeling
14520 OLIVE HILL DR

Replacement of an existing water heater Navien 240A2 tankless gas water heater Located in in 2nd floor attic

FinalPlumbing PermitChange OutMay 2026
View Details
2026-050832 PP
๐Ÿ”งAmerican Residential Services (ARS) - Rescue Rooter

Quick Actions

TDLR ID: TABS2025017659

Design Firm

๐Ÿ›๏ธ
B R Design
View company profile
11S220 carpenter street, Lemont, Illinois 60439

Registered Accessibility Specialist

๐Ÿ“‹
ROB ROY,PARNELL
RAS #184
251 MCKELLAR RD, DRIPPING SPRINGS, TX 78620

Tenant

๐Ÿข
Ajay Bajaj
๐Ÿ“Š

Williamson County Economy

4.2%
Unemployment
$437K
Median Listing
4,956
Bldg Permits/yr
753K
Population
3,420
Active Listings
$113K
Median Income
Source: FRED ยท Updated Jun 2026
County projects โ†’

Need a contractor for this project?

Browse verified general contractors active in Williamson County

Find General Contractors in Williamson

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists