Final inspection completed, awaiting project closure
Lakeway Activity Center Playground is a Renovation/Alteration project located at 105 Cross Creek, Lakeway, TX 78734 in Lakeway, Texas. The project has an estimated value of $250K covering 2,853 sq ft. City of Lakeway is the property owner and Huitt-Zollars Inc is the design firm of record. The project was registered with TDLR on September 30, 2024.
reconstruct playground area into new ADA Accessible playground.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 30, 2024
Review Complete
Sep 30, 2024
Inspection Complete
Apr 8, 2026
Closed
555d
Construction phase
Building permits found at or near this location
Express: Remove existing siding to entire home and discard. Install new James Hardie Fiber Cement Siding
EPLAN - Interior remodel of existing office.
Enclose covered porch into conditioned office space. No change to building footprint or roof height. New framing windows exterior wall infill insulation drywall finishes mini-split HVAC and electrical for lighting fan and receptacles.
Express- Replace 5 windows and 1 door like for like in existing residential home.
QT - REMOVE AND REPLACE EXISTING DUMPSTER ENCLOSURE SIZE FOR SIZE. ADD NEW 10X20 CONCRETE PAD/WALLS FOR ADDITIONAL DUMPSTER/RECYCLING/COMPOSTING - OVA