Design review complete, construction may proceed
Hamilton Greenbelt and Smith Greenbelt Pedestrian Bridges is a Renovation/Alteration project located at North of 309 Palos Verdes Dr / 1420 Lakeway Dr, Lakeway, TX 78734 in Lakeway, Texas. The project has an estimated value of $200K covering 220 sq ft. City of Lakeway is the property owner and Huitt-Zollars Inc is the design firm of record. The project was registered with TDLR on October 22, 2024.
reconstruct pedestrian bridges into a new ADA accessible bridges, 220 SF combined.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 22, 2024
Review Complete
Oct 22, 2024
Inspection Complete
Closed
Building permits found at or near this location
New 2 Stry SF Resid w/att garage porch and patio EUD
New Residence
New Residence
Installation of solar panel system for SF residence.
disconnect service to tighten meter and reconnect service. EUD.