X-Golf Tenant Finish-out is a renovation/alteration project at 12301 W. Parmer Street, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $200K across about 3,500 sq ft.
Project has been completed and closed
X-Golf Tenant Finish-out is a Renovation/Alteration project located at 12301 W. Parmer Street, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $200K covering 3,500 sq ft. SPVA Intelligence LLC is the property owner and M Architects is the design firm of record. The project was registered with TDLR on November 7, 2024.
X-Golf Tenant Finish-out is a renovation/alteration project at 12301 W. Parmer Street in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant alteration
Construction on X-Golf Tenant Finish-out is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
X-Golf Tenant Finish-out is located at 12301 W. Parmer Street, Cedar Park, TX, 78613, in Williamson County.
SPVA Intelligence LLC is the property owner/developer of record for X-Golf Tenant Finish-out, per its TDLR project registration.
M Architects is the design firm of record for X-Golf Tenant Finish-out, according to its TDLR filing.
X-Golf Tenant Finish-out has an estimated construction value of $200K and approximately 3,500 square feet (about $57/sqft), based on its TDLR filing.
Interior tenant alteration
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 7, 2024
Review Complete
Inspection Complete
Closed
Mar 5, 2025
Building permits found at or near this location
Interior Alteration of Approx. (3895) of existing Suite 425.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)
Interior Alteration of Approx. (4810) of existing Suite 400.
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA