Bagel Bear is a renovation/alteration project at 12301 W Parmer Lane, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $150K across about 2,100 sq ft.
Project has been completed and closed
Bagel Bear is a Renovation/Alteration project located at 12301 W Parmer Lane, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $150K covering 2,100 sq ft. SPVA Intelligence LLC is the property owner and Beardslee Waites Architects is the design firm of record. The project was registered with TDLR on January 16, 2025.
Bagel Bear is a renovation/alteration project at 12301 W Parmer Lane in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Interiors food service facility to serve bagels. Includes bakery, prep area, serving area, dining and two restrooms
Construction on Bagel Bear is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Bagel Bear is located at 12301 W Parmer Lane, Cedar Park, TX, 78613, in Williamson County.
SPVA Intelligence LLC is the property owner/developer of record for Bagel Bear, per its TDLR project registration.
Beardslee Waites Architects is the design firm of record for Bagel Bear, according to its TDLR filing.
Bagel Bear has an estimated construction value of $150K and approximately 2,100 square feet (about $71/sqft), based on its TDLR filing.
Tenant Interiors food service facility to serve bagels. Includes bakery, prep area, serving area, dining and two restrooms
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 16, 2025
Review Complete
Inspection Complete
Jan 16, 2025
Closed
Jan 9, 2026
Building permits found at or near this location
Interior Alteration of Approx. (4810) of existing Suite 400.
Interior Alteration to create new corridor approx. (932) of existing interior space. (Floor 4 Building V)
Interior Alteration of Approx. (3895) of existing Suite 425.
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA