Pflugerville Downtown East Infrastructure
๐Project Metrics
TDLR #TABS2025006512Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Subdivision construction plans for an 8-lot subdivision with infrastructure build out for future buildings. The current improvements are comprised of grading, drainage, roadway, and utility improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$20.5M total๐๏ธSame Design Firm
$41.1M total๐Related City Permits
Building permits found at or near this location
Change-out HVAC to existing residence only.
Install EVSE in garage
Replace siding on existing single-family residence. No other changes authorized under this permit.
Replace sewer line in the yard replace the sewer line in the yard only.
Replacement of complete existing central heat and air system with or without duct work