Project intelligenceTDLR TABS2026001361Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

County Line Road Phase 2 & Kennedy Street in Elgin, TX

County Line Rd & Kennedy St, Elgin, TX, 78621

Opening ~Mar 2027Project Registered

County Line Road Phase 2 & Kennedy Street is a renovation/alteration project at County Line Rd & Kennedy St, Elgin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $10.0M across about 3,111 sq ft.

Estimated project value
$10.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,111 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.21K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 19, 2025558 days across supplied datesMar 31, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    104 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    454 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About County Line Road Phase 2 & Kennedy Street

County Line Road Phase 2 & Kennedy Street is a major infrastructure project located at County Line Rd & Kennedy St in Elgin, Texas. This renovation and alteration effort involves approximately 4,639 feet of road widening and drainage improvements. The scope also includes the construction of roughly 3,111 square feet of new sidewalk with ADA-compliant ramps, designed to enhance accessibility and safety for pedestrians in the West University area of Travis County.

Project Scope and Financials

With an estimated cost of $10,000,000, County Line Road Phase 2 & Kennedy Street represents a substantial investment in local public infrastructure. The filing identifies TRC Engineers, Inc. as the design firm of record, while Jesus E Lardizabal is listed as the registered accessibility specialist. The project was registered with TDLR in September 2025, and plan review is pending. Construction is scheduled to begin in January 2026, with completion targeted for March 2027.

The estimated cost per square foot stands at $3,214. According to data from over 15,000 TDLR-registered renovation and alteration filings in Travis County, this figure is above the county median of $103 per square foot. The scheduled build window of 454 days is also longer than the county median of 98 days for similar projects. The City of Elgin has six other TDLR-registered projects totaling $7,950,000, while TRC Engineers, Inc. has six other projects totaling $25,263,720, indicating a pattern of significant municipal and infrastructure work in the region.

This project involves public funds and is a Federally funded roadway project. The surrounding area, ZIP code 78621, has a population of about 27,860 residents with a median household income of $88,246. The housing stock is predominantly owner-occupied, with a median home value of $262,300. Local businesses near the site include Pluckers Wing Bar, The Mansion, and Caswell Tennis Center. The Travis County unemployment rate was 3.9 percent in July 2026, reflecting the local labor market context for this construction effort.

The project is registered with TDLR and is targeted for March 2027. The status is Project Registered, with plan review pending. The specific focus on road widening and drainage improvements, combined with the addition of ADA ramps, highlights a dual purpose of traffic management and accessibility compliance. The involvement of federal funds underscores the importance of this roadway segment in the broader Elgin transportation network.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78621 (Elgin)

One email per change. Unsubscribe in one click. Privacy.

County Line Road Phase 2 & Kennedy Street is a Renovation/Alteration project located at County Line Rd & Kennedy St, Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $10.0M covering 3,111 sq ft. City of Elgin is the property owner and TRC Engineers, Inc. is the design firm of record. The project was registered with TDLR on September 19, 2025.

Frequently Asked Questions

What is the total estimated cost of the County Line Road project?

The estimated cost for the County Line Road Phase 2 & Kennedy Street project is $10,000,000.

When is construction expected to start and finish?

Construction is scheduled to start in January 2026, and the project is targeted for March 2027.

Who is the design firm for this road widening project?

TRC Engineers, Inc. is the design firm of record for this project.

Does this project include new sidewalks?

Yes, the scope includes approximately 3,111 square feet of proposed sidewalk with ADA ramps.

Is the project completed?

No, the project is registered with TDLR and plan review is pending, with completion targeted for March 2027.

What is County Line Road Phase 2 & Kennedy Street?

County Line Road Phase 2 & Kennedy Street is a renovation/alteration project at County Line Rd & Kennedy St in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of approximately 4,639 ft of road widening and drainage improvements along County Line Road and Kennedy Street, to include approximately 3,111 SY of proposed sidewalk with ADA ramps.

Is County Line Road Phase 2 & Kennedy Street open in Elgin?

County Line Road Phase 2 & Kennedy Street is still under construction in Elgin, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is County Line Road Phase 2 & Kennedy Street located?

County Line Road Phase 2 & Kennedy Street is located at County Line Rd & Kennedy St, Elgin, TX, 78621, in Travis County.

Who is the owner or developer of County Line Road Phase 2 & Kennedy Street?

City of Elgin is the property owner/developer of record for County Line Road Phase 2 & Kennedy Street, per its TDLR project registration.

Who is the architect or design firm for County Line Road Phase 2 & Kennedy Street?

TRC Engineers, Inc. is the design firm of record for County Line Road Phase 2 & Kennedy Street, according to its TDLR filing.

How much does County Line Road Phase 2 & Kennedy Street cost and how big is it?

County Line Road Phase 2 & Kennedy Street has an estimated construction value of $10.0M and approximately 3,111 square feet (about $3.21K/sqft), based on its TDLR filing.

Scope of Work

The project consists of approximately 4,639 ft of road widening and drainage improvements along County Line Road and Kennedy Street, to include approximately 3,111 SY of proposed sidewalk with ADA ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

County Line Rd & Kennedy St, Elgin, TX, 78621

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78621 (Elgin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.