Blazier Elementary School Secure Vestibule
๐Project Metrics
TDLR #TABS2025007409Project Closed
Project has been completed and closed
๐Scope of Work
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. Renovation consists of access control and technology upgrades along with minor interior finishes, mechanical, and electrical scope.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐Related City Permits
Building permits found at or near this location
New single-story SFR (4br/2.5ba) with attached garage and covered porch/patio *PRODUCTION BUILDER- GREEN BUILDING*
temporary tpole for new construction for Easton Park
New single-story SFR (4br/2.5ba) with attached garage and covered porch/patio *PRODUCTION BUILDER- GREEN BUILDING*
Pool - Pool 29x15ft with an inside 11x7ft spa. 939 sq ft of turf (on non compacted soil) 607 sq ft of pea gravel one 8x13x9ft Metal pergola with metal flat roof and 6x1ยฟ cedar wood privacy slats with 190 sq ft of concrete decking. Equipment pad 3x8ft (24 sq ft). Autofil and electric heater.
Pool - Pool 29x15ft with an inside 11x7ft spa. 939 sq ft of turf (on non compacted soil) 607 sq ft of pea gravel one 8x13x9ft Metal pergola with metal flat roof and 6x1ยฟ cedar wood privacy slats with 190 sq ft of concrete decking. Equipment pad 3x8ft (24 sq ft). Autofil and electric heater.