Project has been completed and closed
Casey Elementary School Secure Vestibule is a Alteration/Renovation project located at 9400 Texas Oaks Dr. in Austin, Texas. The project has an estimated value of $189K covering 1,000 sq ft. Austin Independent School District is the property owner and Marmon Mok is the design firm of record. The project was registered with TDLR on December 11, 2024.
Renovate the existing administration and main entry area to design a secured vestibule for students and staff. Renovation consists of access control and technology upgrades along with minor interior finishes, mechanical, and electrical scope.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 11, 2024
Review Complete
Inspection Complete
Dec 11, 2024
Closed
Dec 5, 2025
Building permits found at or near this location
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. Renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Complete Removal of Existing Membrane Roofing; Selective Demolition of HVAC Units Admin Area and Associated HRUs. Selective Demolition of Classroom Water Source Heat Pumps. New Work Structural Steel Framing as required for HRU Replacement. Membrane roofing EIFS (as required for repair work). Interior Finishes patch and repair with like materials as required for any materials disturbed during classroom HVAC Replacement for Casey Elementary School
Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. Renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required
Complete Removal of Existing Membrane Roofing; Selective Demolition of HVAC Units Admin Area and Associated HRUs. Selective Demolition of Classroom Water Source Heat Pumps. New Work Structural Steel Framing as required for HRU Replacement. Membrane roofing EIFS (as required for repair work). Interior Finishes patch and repair with like materials as required for any materials disturbed during classroom HVAC Replacement for Casey Elementary School
Replacement of complete existing central heat and air system with or without duct work
City of Austin site plan approvals at this location