Audacy
Audacy is a renovation/alteration project at 12377 Merit Drive Suite 1600, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $4.0M across about 20,965 sq ft.
๐Project Metrics
TDLR #TABS2025009458Project Closed
Project has been completed and closed
Audacy is a Renovation/Alteration project located at 12377 Merit Drive Suite 1600, Dallas, TX 75251 in Dallas, Texas. The project has an estimated value of $4.0M covering 20,965 sq ft. Lakeside Square Owner, LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 14, 2025.
โFrequently Asked Questions
What is Audacy?
Audacy is a renovation/alteration project at 12377 Merit Drive Suite 1600 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvement
Is Audacy open in Dallas?
Construction on Audacy is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Where is Audacy located?
Audacy is located at 12377 Merit Drive Suite 1600, Dallas, TX, 75251, in Dallas County.
Who is the owner or developer of Audacy?
Lakeside Square Owner, LP is the property owner/developer of record for Audacy, per its TDLR project registration.
Who is the architect or design firm for Audacy?
Entos Design is the design firm of record for Audacy, according to its TDLR filing.
How much does Audacy cost and how big is it?
Audacy has an estimated construction value of $4.0M and approximately 20,965 square feet (about $191/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 14, 2025
Review Complete
Inspection Complete
Closed
Jan 14, 2025