Anderson High School Modernization is a renovation/alteration project at 8403 Mesa Dr, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $24.2M across about 3,225 sq ft.
Design review complete, construction may proceed
Anderson High School Modernization is a Renovation/Alteration project located at 8403 Mesa Dr, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $24.2M covering 3,225 sq ft. Austin Independent School District is the property owner and PBK Architects is the design firm of record. The project was registered with TDLR on February 10, 2025.
Anderson High School Modernization is a renovation/alteration project at 8403 Mesa Dr in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Administration suite renovation
Anderson High School Modernization is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Anderson High School Modernization is located at 8403 Mesa Dr, Austin, TX, 78759, in Travis County.
Austin Independent School District is the property owner/developer of record for Anderson High School Modernization, per its TDLR project registration.
PBK Architects is the design firm of record for Anderson High School Modernization, according to its TDLR filing.
Anderson High School Modernization has an estimated construction value of $24.2M and approximately 3,225 square feet (about $7.51K/sqft), based on its TDLR filing.
Administration suite renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 10, 2025
Review Complete
Feb 10, 2025
Inspection Complete
Closed
Building permits found at or near this location
Express- Tub to shower replacement (prefab base) in the same location without relocating plumbing
Express- Tub to shower replacement (prefab base) in the same location without relocating plumbing
Replacement of complete existing central heat and air system with or without duct work Install replacement of 5 Ton AC System
Phase 2 Interior Remodel & Combining Unit F Into Unit D. Total Sf of Unit D = 8438 Unit D Remodeled Under 2026-013838 PR
Phase 2 Interior Remodel & Combining Unit F Into Unit D. Total Sf of Unit D = 8438 Unit D Remodeled Under 2026-013838 PR