Sweetgreen - Village at Westlake
๐Project Metrics
TDLR #TABS2025012979Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
TENANT EXTERIOR AND INTERIOR ALTERATIONS TO AN EXISTING BUILDING. MODIFICATIONS TO INCLUDE NEW PARTITION WALLS, CEILINGS, ELECTRICAL, PLUMBING AND HVAC AS NEEDED FOR OPERATION OF A FAST-CASUAL SALAD RESTAURANT.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$3.5M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 TON 2 STAGE HORIZONTAL GAS SYSTEM
Construct a new walkway connecting from sidewalk to residence of 5 FT. SP-2024-0344C 2025 092714 000 00 SSI
Main panel replacement (without meters can) Replacing old main panel without a main breaker for a new one with a main breaker. No service upgrade no meter can replacement.
temporary tpole for new construction in Easton Park Ref 2025-119743 BP
Stationary Gantry Crane Installation in an Existing Lab Space