HPI Office - Floor 3 is a renovation/alteration project at 901 S. Mopac Expressway Building 3, Suite 310, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $210K across about 3,500 sq ft.
Project has been completed and closed
HPI Office - Floor 3 is a Renovation/Alteration project located at 901 S. Mopac Expressway Building 3, Suite 310, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $210K covering 3,500 sq ft. HPIBOP 2&3 JV LP is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on March 5, 2025.
HPI Office - Floor 3 is a renovation/alteration project at 901 S. Mopac Expressway Building 3, Suite 310 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing suite for new tenant.
Construction on HPI Office - Floor 3 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
HPI Office - Floor 3 is located at 901 S. Mopac Expressway Building 3, Suite 310, Austin, TX, 78746, in Travis County.
HPIBOP 2&3 JV LP is the property owner/developer of record for HPI Office - Floor 3, per its TDLR project registration.
S. Tipton Studio is the design firm of record for HPI Office - Floor 3, according to its TDLR filing.
HPI Office - Floor 3 has an estimated construction value of $210K and approximately 3,500 square feet (about $60/sqft), based on its TDLR filing.
Remodel of existing suite for new tenant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 5, 2025
Review Complete
Inspection Complete
Closed
Mar 5, 2025
Building permits found at or near this location
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.
Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.