ActivTrak
ActivTrak is a renovation/alteration project at 901 S. Mopac Expressway Suite 130, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $400K across about 4,801 sq ft.
๐Project Metrics
TDLR #TABS2026020031Review Complete
Design review complete, construction may proceed
ActivTrak is a Renovation/Alteration project located at 901 S. Mopac Expressway Suite 130, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $400K covering 4,801 sq ft. HPIBOP 2&3 JV LP is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on May 12, 2026.
โFrequently Asked Questions
What is ActivTrak?
ActivTrak is a renovation/alteration project at 901 S. Mopac Expressway Suite 130 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office space for new tenant. Total scope of work is approx. 4,801 SF.
Is ActivTrak open in Austin?
ActivTrak is still under construction in Austin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is ActivTrak located?
ActivTrak is located at 901 S. Mopac Expressway Suite 130, Austin, TX, 78746, in Travis County.
Who is the owner or developer of ActivTrak?
HPIBOP 2&3 JV LP is the property owner/developer of record for ActivTrak, per its TDLR project registration.
Who is the architect or design firm for ActivTrak?
S. Tipton Studio is the design firm of record for ActivTrak, according to its TDLR filing.
How much does ActivTrak cost and how big is it?
ActivTrak has an estimated construction value of $400K and approximately 4,801 square feet (about $83/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing office space for new tenant. Total scope of work is approx. 4,801 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 12, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
41d
Review duration
๐Related Projects
๐คSame Owner
$1.6M total๐๏ธSame Design Firm
$2.8M total๐Related City Permits
Building permits found at or near this location
New construction in-ground pool concrete deck and associated equipment pad.
CHANGE OF USE ADM OFFICE TO MEDICAL OFFICE with interior remodel
Verizon proposed fiber installation - boring conduit from ROW to proposed fiber vault/ building entry. No backup batteries or generator proposed.
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
Replacement of complete existing central heat and air system with or without duct work