Construction complete ยท Jan 2026๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

Gym at BOP III

901 S. Mopac Expressway Suite 115, Austin, TX 78746, Austin, TX, 78746

Gym at BOP III is a renovation/alteration project at 901 S. Mopac Expressway Suite 115, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $550K across about 2,355 sq ft.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2025013596
$550K
Project Value
2,355
Square Feet
$234/sqft
Cost/SqFt
4 months
Duration
Registered:Mar 7, 2025
Start:Apr 28, 2025
Target:Aug 25, 2025
๐Ÿ

Project Closed

Project has been completed and closed

Gym at BOP III is a Renovation/Alteration project located at 901 S. Mopac Expressway Suite 115, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $550K covering 2,355 sq ft. HPI BOP 2&3 JV, LP is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on March 7, 2025.

โ“Frequently Asked Questions

What is Gym at BOP III?

Gym at BOP III is a renovation/alteration project at 901 S. Mopac Expressway Suite 115 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office space for new building amenity.

Is Gym at BOP III open in Austin?

Construction on Gym at BOP III is complete โ€” TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.

Where is Gym at BOP III located?

Gym at BOP III is located at 901 S. Mopac Expressway Suite 115, Austin, TX, 78746, in Travis County.

Who is the owner or developer of Gym at BOP III?

HPI BOP 2&3 JV, LP is the property owner/developer of record for Gym at BOP III, per its TDLR project registration.

Who is the architect or design firm for Gym at BOP III?

S. Tipton Studio is the design firm of record for Gym at BOP III, according to its TDLR filing.

How much does Gym at BOP III cost and how big is it?

Gym at BOP III has an estimated construction value of $550K and approximately 2,355 square feet (about $234/sqft), based on its TDLR filing.

๐Ÿ“‹Scope of Work

Remodel of existing office space for new building amenity.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 7, 2025
Inspection Complete
+309d
March 7, 2025
Project Closed
January 10, 2026
Construction Start
April 28, 2025
Expected Completion
August 25, 2025

๐Ÿ“…Project Timeline

Filed

Mar 7, 2025

Review Complete

Inspection Complete

Mar 7, 2025

Closed

Jan 10, 2026

๐Ÿ“„Related City Permits

Building permits found at or near this location

901 1/2 S MOPAC EXPY SVRD NB

Verizon proposed fiber installation - boring conduit from ROW to proposed fiber vault/ building entry. No backup batteries or generator proposed.

ActiveBuilding PermitRemodelJun 2026
View Details
2026-081122 BP
๐Ÿ”งMidland Tower Construction LP
901 S MOPAC EXPY SVRD NB BLDG 4 UNIT 180

Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.

ActivePlumbing PermitRemodelJun 2026
View Details
2026-076582 PP
๐Ÿ”งCentral Texas Plumbing
9011 COPANO DR

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutJun 2026
View Details
2026-068797 MP
๐Ÿ”งFox Service Company
901 S MOPAC EXPY SVRD NB BLDG 4 UNIT 180

Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.

ActiveBuilding PermitRemodelJun 2026
View Details
2026-076582 BP
๐Ÿ”งQual-Con General Contractor LLC
901 E 5TH ST

Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS.

ActiveBuilding PermitRemodelJun 2026
View Details
2026-062520 BP
๐Ÿ”งFuture Electric

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists