MCH - Frisco Tower Advanced Reconstruction is a renovation/alteration project at 5575 Frisco Blvd Suite 110, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $150K across about 3,174 sq ft.
Project has been completed and closed
MCH - Frisco Tower Advanced Reconstruction is a Renovation/Alteration project located at 5575 Frisco Blvd Suite 110, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $150K covering 3,174 sq ft. Medical City of Frisco is the property owner and MPI Architects is the design firm of record. The project was registered with TDLR on April 9, 2025.
MCH - Frisco Tower Advanced Reconstruction is a renovation/alteration project at 5575 Frisco Blvd Suite 110 in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Design 3174 USF
Construction on MCH - Frisco Tower Advanced Reconstruction is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.
MCH - Frisco Tower Advanced Reconstruction is located at 5575 Frisco Blvd Suite 110, Frisco, TX, 75034, in Collin County.
Medical City of Frisco is the property owner/developer of record for MCH - Frisco Tower Advanced Reconstruction, per its TDLR project registration.
MPI Architects is the design firm of record for MCH - Frisco Tower Advanced Reconstruction, according to its TDLR filing.
MCH - Frisco Tower Advanced Reconstruction has an estimated construction value of $150K and approximately 3,174 square feet (about $47/sqft), based on its TDLR filing.
Interior Design 3174 USF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 9, 2025
Review Complete
Inspection Complete
Closed
Apr 9, 2025