Arrow Active Play Park is a new construction project at 3250 SIDNEY BAKER N., Kerrville, in Kerr County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.2M across about 9,549 sq ft.
Design review complete, construction may proceed
Arrow Active Play Park is a New Construction project located at 3250 SIDNEY BAKER N. in Kerrville, Texas. The project has an estimated value of $1.2M covering 9,549 sq ft. APOK HOLDINGS, LLC is the property owner and Ben Adam Architect, LLC is the design firm of record. The project was registered with TDLR on May 5, 2025.
Arrow Active Play Park is a new construction project at 3250 SIDNEY BAKER N. in Kerrville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONSTRUCTION OF A NEW ONE STORY METAL FRAME RECREATIONAL FACILITY WITH MEZZANINE. SITE WORK TO INCLUDE PARKING, SITE DRAINAGE, WALKS, SEPTIC SYSTEM, RETENTION WALLS AND MINIMAL LANDSCAPE. SEPARATE PERMIT REQUIRED FROM TxDOT FOR HIGHWAY Aโฆ
Arrow Active Play Park is currently under construction in Kerrville, TX. Its current TDLR status is "Review Complete".
Arrow Active Play Park is located at 3250 SIDNEY BAKER N., Kerrville, TX, 78028, in Kerr County.
APOK HOLDINGS, LLC is the property owner/developer of record for Arrow Active Play Park, per its TDLR project registration.
Ben Adam Architect, LLC is the design firm of record for Arrow Active Play Park, according to its TDLR filing.
Arrow Active Play Park has an estimated construction value of $1.2M and approximately 9,549 square feet (about $126/sqft), based on its TDLR filing.
CONSTRUCTION OF A NEW ONE STORY METAL FRAME RECREATIONAL FACILITY WITH MEZZANINE. SITE WORK TO INCLUDE PARKING, SITE DRAINAGE, WALKS, SEPTIC SYSTEM, RETENTION WALLS AND MINIMAL LANDSCAPE. SEPARATE PERMIT REQUIRED FROM TxDOT FOR HIGHWAY ACCESS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 5, 2025
Review Complete
May 5, 2025
Inspection Complete
Closed
Need a contractor for this project?
Browse verified general contractors active in Kerr County
Find General Contractors in Kerr