MNC Modification Locker Room
MNC Modification Locker Room is a renovation/alteration project at 2015 San Jacinto Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2025). The project has an estimated value of $6.0M across about 5,400 sq ft.
๐Project Metrics
TDLR #TABS2025019194Project Closed
Project has been completed and closed
MNC Modification Locker Room is a Renovation/Alteration project located at 2015 San Jacinto Blvd., Austin, TX 78712 in Austin, Texas. The project has an estimated value of $6.0M covering 5,400 sq ft. Nathaniel Atkins is the property owner and Gensler is the design firm of record. The project was registered with TDLR on May 16, 2025.
โFrequently Asked Questions
What is MNC Modification Locker Room?
MNC Modification Locker Room is a renovation/alteration project at 2015 San Jacinto Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior modification of existing locker room
Is MNC Modification Locker Room open in Austin?
Construction on MNC Modification Locker Room is complete โ TDLR records show the project passed its required accessibility inspection in May 2025. The building is finished and very likely open.
Where is MNC Modification Locker Room located?
MNC Modification Locker Room is located at 2015 San Jacinto Blvd., Austin, TX, 78712, in Travis County.
Who is the owner or developer of MNC Modification Locker Room?
Nathaniel Atkins is the property owner/developer of record for MNC Modification Locker Room, per its TDLR project registration.
Who is the architect or design firm for MNC Modification Locker Room?
Gensler is the design firm of record for MNC Modification Locker Room, according to its TDLR filing.
How much does MNC Modification Locker Room cost and how big is it?
MNC Modification Locker Room has an estimated construction value of $6.0M and approximately 5,400 square feet (about $1.11K/sqft), based on its TDLR filing.
๐Scope of Work
interior modification of existing locker room
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 16, 2025
Review Complete
Inspection Complete
Closed
May 16, 2025
๐Related Projects
๐คSame Owner
$6.9M total๐๏ธSame Design Firm
$182.3M total๐Related City Permits
Building permits found at or near this location
Build a temporary pole for construction of a single family dwelling ref. 2026-005469 BP
New shed with permanent walls & electricity.
ePlan: Residential Expedited Review - New construction of a 1-story single family residence with 3 bedroom 2.5 bath rear patio 1 car garage.
ePlan: Residential Expedited Review - New construction of a 1-story single family residence with 3 bedroom 2.5 bath rear patio 1 car garage.
up to a 50 pipe burst to replace the sewer line in yard as well as tunnel up to 50 under the home to replace the cast iron line.