Urology
Urology is a renovation/alteration project at 8701 North Mopac Suite 101, Austin, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2025). The project has an estimated value of $490K across about 4,899 sq ft.
๐Project Metrics
TDLR #TABS2025019912Project Closed
Project has been completed and closed
Urology is a Renovation/Alteration project located at 8701 North Mopac Suite 101, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $490K covering 4,899 sq ft. Eurus Capital Partners is the property owner and NuVu Interiors ATX is the design firm of record. The project was registered with TDLR on May 28, 2025.
โFrequently Asked Questions
What is Urology?
Urology is a renovation/alteration project at 8701 North Mopac Suite 101 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of warm shell space.
Is Urology open in Austin?
Construction on Urology is complete โ TDLR records show the project passed its required accessibility inspection in May 2025. The building is finished and very likely open.
Where is Urology located?
Urology is located at 8701 North Mopac Suite 101, Austin, TX, 78759, in Hays County.
Who is the owner or developer of Urology?
Eurus Capital Partners is the property owner/developer of record for Urology, per its TDLR project registration.
Who is the architect or design firm for Urology?
NuVu Interiors ATX is the design firm of record for Urology, according to its TDLR filing.
How much does Urology cost and how big is it?
Urology has an estimated construction value of $490K and approximately 4,899 square feet (about $100/sqft), based on its TDLR filing.
๐Scope of Work
Interior remodel of warm shell space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 28, 2025
Review Complete
Inspection Complete
Closed
May 28, 2025
๐Related Projects
๐๏ธSame Design Firm
$19.3M total๐Related City Permits
Building permits found at or near this location
12x25 Pool with autofill NG heater and ASTM F1346 Automatic safety cover.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
Front yard residential irrigation system. 6 zone system including 3 dripper irrigation zones (2 for strips by road 1 for flower bed) and 3 mp rotator grass zones (2 side yard zones and 1 main front yard zone). Master valve isolation valve double check valve assembly rain sensor and rachio control box included in system. Trench depth to be 8 to 10 inches 6 inches of fill on top of pipes. Main line will horseshoe around the house so trenching will be done through the back yard for wiring and mainline. No back yard irrigation zones. 4 inch pop up heads used secured to class 200 3/4 inch lateral line pipe using swing pipe. Mainline to be 1 inch pipe. Purple primer and blue glue used for all connections.
MAIN ELECTRICAL SERVICE UPGRADE TO 200 AMPS
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT