Waterstone Spec Suite 2 is a renovation/alteration project at 14031 FM 110 Bldg. 2, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $800K across about 187,283 sq ft.
Final inspection completed, awaiting project closure
Waterstone Spec Suite 2 is a Renovation/Alteration project located at 14031 FM 110 Bldg. 2, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $800K covering 187,283 sq ft. Waterstone San Marcos Owner LLC is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on June 2, 2025.
Waterstone Spec Suite 2 is a renovation/alteration project at 14031 FM 110 Bldg. 2 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant office build out to a previously permitted shell warehouse building.
Construction on Waterstone Spec Suite 2 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Waterstone Spec Suite 2 is located at 14031 FM 110 Bldg. 2, Kyle, TX, 78640, in Hays County.
Waterstone San Marcos Owner LLC is the property owner/developer of record for Waterstone Spec Suite 2, per its TDLR project registration.
S. Tipton Studio is the design firm of record for Waterstone Spec Suite 2, according to its TDLR filing.
Waterstone Spec Suite 2 has an estimated construction value of $800K and approximately 187,283 square feet (about $4/sqft), based on its TDLR filing.
Tenant office build out to a previously permitted shell warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 2, 2025
Review Complete
Jun 2, 2025
Inspection Complete
Apr 16, 2026
Closed
318d
Construction phase