XQAF1-PHASE 2A
XQAF1-PHASE 2A is a renovation/alteration project at 6925 FM Road 1327, Mustang Ridge, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $6.0M across about 75,458 sq ft.
๐Project Metrics
TDLR #TABS2025020775Review Complete
Design review complete, construction may proceed
XQAF1-PHASE 2A is a Renovation/Alteration project located at 6925 FM Road 1327, Mustang Ridge, TX 78747 in Mustang Ridge, Texas. The project has an estimated value of $6.0M covering 75,458 sq ft. EXETER MUSTANG RIDGE LP is the property owner and INSPIRED ARCHITECTURE LLC is the design firm of record. The project was registered with TDLR on June 8, 2025.
โFrequently Asked Questions
What is XQAF1-PHASE 2A?
XQAF1-PHASE 2A is a renovation/alteration project at 6925 FM Road 1327 in Mustang Ridge, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior built-out of 2-story office and 1-story industrial area within existing shell building
Is XQAF1-PHASE 2A open in Mustang Ridge?
XQAF1-PHASE 2A is currently under construction in Mustang Ridge, TX. Its current TDLR status is "Review Complete".
Where is XQAF1-PHASE 2A located?
XQAF1-PHASE 2A is located at 6925 FM Road 1327, Mustang Ridge, TX, 78747, in Travis County.
Who is the owner or developer of XQAF1-PHASE 2A?
EXETER MUSTANG RIDGE LP is the property owner/developer of record for XQAF1-PHASE 2A, per its TDLR project registration.
Who is the architect or design firm for XQAF1-PHASE 2A?
INSPIRED ARCHITECTURE LLC is the design firm of record for XQAF1-PHASE 2A, according to its TDLR filing.
How much does XQAF1-PHASE 2A cost and how big is it?
XQAF1-PHASE 2A has an estimated construction value of $6.0M and approximately 75,458 square feet (about $80/sqft), based on its TDLR filing.
๐Scope of Work
Interior built-out of 2-story office and 1-story industrial area within existing shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 8, 2025
Review Complete
Jun 8, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$12.0M total๐Related City Permits
Building permits found at or near this location
Install new 240 volt 35 amp breaker in 200 amp main panel. This is to control a new A/C mini split unit for the garage. A/C condenser will be installed within 10ft of electrical panel so that the breaker will serve as the disconnecting means in lieu of external pull handle disconnect.
Express: Replace 4 windows like for like
Nayak: EV Charging Station Installation and Service Upgrade - PEC.
Replace panel & meter socket. Utility company is PEC.
Replacement of complete existing central heat and air system with or without duct work