XQAF1-PHASE 2B
XQAF1-PHASE 2B is a additions to existing building project at 6925 FM Road 1327, Mustang Ridge, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $997K across about 12,459 sq ft.
๐Project Metrics
TDLR #TABS2025020776Review Complete
Design review complete, construction may proceed
XQAF1-PHASE 2B is a Additions to Existing Building project located at 6925 FM Road 1327, Mustang Ridge, TX 78747 in Mustang Ridge, Texas. The project has an estimated value of $997K covering 12,459 sq ft. EXETER MUSTANG RIDGE LP is the property owner and INSPIRED ARCHITECTURE LLC is the design firm of record. The project was registered with TDLR on June 8, 2025.
โFrequently Asked Questions
What is XQAF1-PHASE 2B?
XQAF1-PHASE 2B is a additions to existing building project at 6925 FM Road 1327 in Mustang Ridge, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of 1-story Auxiliary Building with Mezzanine level for mechanical use
Is XQAF1-PHASE 2B open in Mustang Ridge?
XQAF1-PHASE 2B is currently under construction in Mustang Ridge, TX. Its current TDLR status is "Review Complete".
Where is XQAF1-PHASE 2B located?
XQAF1-PHASE 2B is located at 6925 FM Road 1327, Mustang Ridge, TX, 78747, in Travis County.
Who is the owner or developer of XQAF1-PHASE 2B?
EXETER MUSTANG RIDGE LP is the property owner/developer of record for XQAF1-PHASE 2B, per its TDLR project registration.
Who is the architect or design firm for XQAF1-PHASE 2B?
INSPIRED ARCHITECTURE LLC is the design firm of record for XQAF1-PHASE 2B, according to its TDLR filing.
How much does XQAF1-PHASE 2B cost and how big is it?
XQAF1-PHASE 2B has an estimated construction value of $997K and approximately 12,459 square feet (about $80/sqft), based on its TDLR filing.
๐Scope of Work
Addition of 1-story Auxiliary Building with Mezzanine level for mechanical use
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 8, 2025
Review Complete
Jun 8, 2025
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$12.0M total๐Related City Permits
Building permits found at or near this location
Install new 240 volt 35 amp breaker in 200 amp main panel. This is to control a new A/C mini split unit for the garage. A/C condenser will be installed within 10ft of electrical panel so that the breaker will serve as the disconnecting means in lieu of external pull handle disconnect.
Express: Replace 4 windows like for like
Nayak: EV Charging Station Installation and Service Upgrade - PEC.
Replace panel & meter socket. Utility company is PEC.
Replacement of complete existing central heat and air system with or without duct work