DAU2_AVI
๐Project Metrics
TDLR #TABS2025021023Review Complete
Design review complete, construction may proceed
๐Scope of Work
New prefabricated metal building with automated vehicle inspection drive-through tunnel shelter that shall be built on-site at an existing amazon delivery station.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$11.7M total๐๏ธSame Design Firm
$5.8M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Install 2000A Generator Docking Station
DAU2 Shunt Trip Breaker 757642- Removal of a bolted pressure switch and installing a shunt trip breaker with contact closures. The service that our scope is dealing with is located on the Northeast side of the building. Not associated with the generator permit or any other work being done at this address. Meter number AE 6124468.
Replace main breaker during scheduled outage.
Install arc flash relay panel next to main gear.
Install channel letters. amazon hub. East elevation.
๐Related Site Plans
City of Austin site plan approvals at this location