CICCIO BOMBA
CICCIO BOMBA is a renovation/alteration project at 1100 S LAMAR BLVD BDLG 2, STE 2140, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $300K across about 3,723 sq ft.
๐Project Metrics
TDLR #TABS2025026996Inspection Complete
Final inspection completed, awaiting project closure
CICCIO BOMBA is a Renovation/Alteration project located at 1100 S LAMAR BLVD BDLG 2, STE 2140, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $300K covering 3,723 sq ft. FHF I LAMAR UNION LLC is the property owner and JDAI STUDIO is the design firm of record. The project was registered with TDLR on August 28, 2025.
โFrequently Asked Questions
What is CICCIO BOMBA?
CICCIO BOMBA is a renovation/alteration project at 1100 S LAMAR BLVD BDLG 2, STE 2140 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR REMODEL FOR RESTAURANT
Is CICCIO BOMBA open in Austin?
Construction on CICCIO BOMBA is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is CICCIO BOMBA located?
CICCIO BOMBA is located at 1100 S LAMAR BLVD BDLG 2, STE 2140, Austin, TX, 78704, in Travis County.
Who is the owner or developer of CICCIO BOMBA?
FHF I LAMAR UNION LLC is the property owner/developer of record for CICCIO BOMBA, per its TDLR project registration.
Who is the architect or design firm for CICCIO BOMBA?
JDAI STUDIO is the design firm of record for CICCIO BOMBA, according to its TDLR filing.
How much does CICCIO BOMBA cost and how big is it?
CICCIO BOMBA has an estimated construction value of $300K and approximately 3,723 square feet (about $81/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR REMODEL FOR RESTAURANT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 28, 2025
Review Complete
Aug 28, 2025
Inspection Complete
Apr 26, 2026
Closed
241d
Construction phase
๐Related Projects
๐คSame Owner
$1.5M total๐๏ธSame Design Firm
$1.0M total๐Related City Permits
Building permits found at or near this location
200amp underground service upgrade
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
New 2-story single family residence 3 bedrooms/2.5 bathrooms attached garage with covered porch and patio
Retaining wall review for multiple single-family residential lots. Walls permitted under Subdivision plans: Saddle Ridge at Wildhorse Ranch Section 1 - Takedown 1 3-8
New construction of 2 story sfr with 4 beds 3.5 baths attached 2 car garage covered patio