POB Conference 3.304 is a renovation/alteration project at 201 E 24th Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $350K across about 1,526 sq ft.
Project has been completed and closed
POB Conference 3.304 is a Renovation/Alteration project located at 201 E 24th Street, Austin, TX 78712 in Austin, Texas. The project has an estimated value of $350K covering 1,526 sq ft. University of Texas at Austin is the property owner and Haddon+Cowan Architects is the design firm of record. The project was registered with TDLR on September 24, 2025.
POB Conference 3.304 is a renovation/alteration project at 201 E 24th Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project comprises the renovation of an existing office (room 3.314) and storage space (room 3.304). New work will provide a new conference room.
Construction on POB Conference 3.304 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
POB Conference 3.304 is located at 201 E 24th Street, Austin, TX, 78712, in Travis County.
University of Texas at Austin is the property owner/developer of record for POB Conference 3.304, per its TDLR project registration.
Haddon+Cowan Architects is the design firm of record for POB Conference 3.304, according to its TDLR filing.
POB Conference 3.304 has an estimated construction value of $350K and approximately 1,526 square feet (about $229/sqft), based on its TDLR filing.
Project comprises the renovation of an existing office (room 3.314) and storage space (room 3.304). New work will provide a new conference room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 24, 2025
Review Complete
Inspection Complete
Closed
Apr 18, 2026
Building permits found at or near this location
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Remove existing pool and replace with a new pool with the same specifications.
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Bldg 1 Pool (176sf)
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System