Design review complete, construction may proceed
Consolidated Chemical Facility is a New Construction project located at 941 New Bridge Dr. in Kyle, Texas. The project has an estimated value of $2.0M covering 2,061 sq ft. City of Kyle is the property owner and STV Inc. is the design firm of record. The project was registered with TDLR on September 29, 2025.
New pre-cast Consolidated Chemical Facility, consisting of two chemical rooms and an electrical room to service plant operations at the Kyle Wastewater Treatment Plant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 29, 2025
Review Complete
Dec 15, 2025
Inspection Complete
Closed
77d
Review duration
Building permits found at or near this location
New Irrigation Installation
New Irrigation Installation
*Green Building* New 1-story 4 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio.
New 1-story single family residence 4 bed/3 bath with attached garage covered porch and patio Green Building
Construct new driveway approach of 18 FT and sidewalk of 46 LF
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays