Center St from Old Stagecoach Rd to RM 150 in Kyle, TX
Center St from Old Stagecoach Rd to RM 150, Kyle, TX, 78640
Center St from Old Stagecoach Rd to RM 150 is a new construction project at Center St from Old Stagecoach Rd to RM 150, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2028. The project has an estimated value of $1.2M across about 522,046 sq ft.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 522,046 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
138 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
73 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
761 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Center St from Old Stagecoach Rd to RM 150
The City of Kyle is executing a roadway reconstruction project named Center St from Old Stagecoach Rd to RM 150. This new construction effort spans the segment from Old Stagecoach Road to RM 150 in Kyle, covering an area of 522,046 sq ft. The estimated cost is $1,150,715, and the scope includes the addition of pedestrian elements to the existing roadway infrastructure.
Pape Dawson Consulting Engineers, LLC serves as the design firm of record for this project. Peter F Grojean is the registered accessibility specialist associated with the filing. The work is classified as new construction involving public funds and public land, indicating a Federally funded roadway project.
Project Timeline and Status
The project was registered with TDLR in February 2026. Plan review was completed in June 2026, and construction is scheduled to finish in October 2028, with work starting September 2026. The TDLR status is listed as Review Complete. The scheduled build window is 761 days, which is longer than the county median of 274 days for similar new construction filings in Hays County.
Cost and Regional Context
The estimated cost of $1,150,715 is above the county median of $950,000 for new construction projects in Hays County. However, the cost per square foot is $2, which is below the county median of $115 per sq ft. This project is one of six other TDLR-registered projects owned by the City of Kyle, which total $22,568,248 in estimated costs. Pape Dawson Consulting Engineers, LLC has one other TDLR-registered project in the area, Old Stagecoach Road, with an estimated cost of $1,661,145.
The project is located in Kyle, Texas, in Hays County. The ZIP code 78640 has a population of about 71,460 and a median household income of $88,533, according to U.S. Census ACS 2023 five-year estimates. The Hays County unemployment rate was 4 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78640 (Kyle)
One email per change. Unsubscribe in one click. Privacy.
Center St from Old Stagecoach Rd to RM 150 is a New Construction project located at Center St from Old Stagecoach Rd to RM 150, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.2M covering 522,046 sq ft. City of Kyle is the property owner and Pape Dawson Consulting Engineers, LLC is the design firm of record. The project was registered with TDLR on February 2, 2026.
Frequently Asked Questions
When is the Center Street reconstruction scheduled to finish?
Construction is scheduled to finish in October 2028, with work starting in September 2026 according to the filing.
Who is the design firm for this project?
Pape Dawson Consulting Engineers, LLC is the design firm of record for this specific roadway reconstruction project.
What is the estimated cost of the project?
The estimated cost for the Center St from Old Stagecoach Rd to RM 150 project is $1,150,715.
What is the scope of work?
The scope includes roadway reconstruction with the addition of pedestrian elements to the existing roadway infrastructure.
Is the project currently open to the public?
The project is in the construction phase, with work starting in September 2026 and finishing in October 2028.
What is Center St from Old Stagecoach Rd to RM 150?
Center St from Old Stagecoach Rd to RM 150 is a new construction project at Center St from Old Stagecoach Rd to RM 150 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway reconstruction with the addition of pedestrian elements
Is Center St from Old Stagecoach Rd to RM 150 open in Kyle?
Center St from Old Stagecoach Rd to RM 150 is still under construction in Kyle, TX, with an estimated completion of Oct 2028 according to its TDLR registration.
Where is Center St from Old Stagecoach Rd to RM 150 located?
Center St from Old Stagecoach Rd to RM 150 is located at Center St from Old Stagecoach Rd to RM 150, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of Center St from Old Stagecoach Rd to RM 150?
City of Kyle is the property owner/developer of record for Center St from Old Stagecoach Rd to RM 150, per its TDLR project registration.
Who is the architect or design firm for Center St from Old Stagecoach Rd to RM 150?
Pape Dawson Consulting Engineers, LLC is the design firm of record for Center St from Old Stagecoach Rd to RM 150, according to its TDLR filing.
How much does Center St from Old Stagecoach Rd to RM 150 cost and how big is it?
Center St from Old Stagecoach Rd to RM 150 has an estimated construction value of $1.2M and approximately 522,046 square feet (about $2/sqft), based on its TDLR filing.
Scope of Work
Roadway reconstruction with the addition of pedestrian elements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Center St from Old Stagecoach Rd to RM 150, Kyle, TX, 78640
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 78640 (Kyle)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Kyle?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.