Project intelligenceTDLR TABS2027002452Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lehman Road Pump Station Improvements in Kyle, TX

1575 Bunton Creek Road, Kyle, TX, 78640

Opening ~Jun 2028Project Registered

Lehman Road Pump Station Improvements is a renovation/alteration project at 1575 Bunton Creek Road, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2028. The project has an estimated value of $24.0M across about 13,788 sq ft.

Estimated project value
$24.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,788 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.74K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 30, 2026619 days across supplied datesJun 10, 2028

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    102 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    517 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lehman Road Pump Station Improvements

The Lehman Pump Station project, filed as Lehman Road Pump Station Improvements, is a major renovation and alteration at 1575 Bunton Creek Road in Kyle, Texas. This City of Kyle initiative involves constructing a 3.0MG ground water storage tank and a 13,788 sq ft pump station facility. The estimated cost is $24,000,000, with construction starting in January 2027 and completion targeted for June 2028.

Project Scope and Scale

The scope includes grading, drainage improvements, a driveway, a parking lot, and utilities. The $24,000,000 estimated cost places this project in the top quarter of renovation and alteration filings in Hays County, where the median estimated cost is $250,000. The cost per square foot is $1741, which is above the county median of $95 per square foot. The scheduled build window of 517 days is longer than the 92-day median build window for similar projects in the county.

This infrastructure upgrade is funded through public funds and involves public land. The project was registered with TDLR in September 2026, with plan review pending. Sarah W Vasquez is the registered accessibility specialist. This location detail is relevant for construction planning and long-term facility resilience.

Local Context and Ownership

The City of Kyle is the owner of record for this project. It is one of several major infrastructure investments in the region, including the Admin Storage and Grit Building and improvements on Center Street. These projects collectively represent a substantial commitment to municipal development and utility maintenance in Hays County. The project status is Project Registered, ensuring compliance with state accessibility standards during the renovation and alteration process.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78640 (Kyle)

One email per change. Unsubscribe in one click. Privacy.

Lehman Road Pump Station Improvements is a Renovation/Alteration project located at 1575 Bunton Creek Road, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $24.0M covering 13,788 sq ft. City of Kyle is the property owner. The project was registered with TDLR on September 30, 2026.

Frequently Asked Questions

When will the Lehman Pump Station be finished?

The project is targeted for June 2028. Construction is scheduled to begin in January 2027, following the September 2026 registration with TDLR.

Who owns the Lehman Road Pump Station Improvements project?

The City of Kyle is the owner and developer of record for this $24,000,000 renovation and alteration project.

How large is the new building at the pump station?

The new building will be 13,788 sq ft, which is significantly larger than the median size of 3,278 sq ft for similar projects in Hays County.

What is Lehman Road Pump Station Improvements?

Lehman Road Pump Station Improvements is a renovation/alteration project at 1575 Bunton Creek Road in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a 3.0MG ground water storage tank, pump station facility, grading, drainage improvements, driveway, parking lot, utilities. New building square footage: 13,788SF

Is Lehman Road Pump Station Improvements open in Kyle?

Lehman Road Pump Station Improvements is still under construction in Kyle, TX, with an estimated completion of Jun 2028 according to its TDLR registration.

Where is Lehman Road Pump Station Improvements located?

Lehman Road Pump Station Improvements is located at 1575 Bunton Creek Road, Kyle, TX, 78640, in Hays County.

Who is the owner or developer of Lehman Road Pump Station Improvements?

City of Kyle is the property owner/developer of record for Lehman Road Pump Station Improvements, per its TDLR project registration.

How much does Lehman Road Pump Station Improvements cost and how big is it?

Lehman Road Pump Station Improvements has an estimated construction value of $24.0M and approximately 13,788 square feet (about $1.74K/sqft), based on its TDLR filing.

Scope of Work

Construction of a 3.0MG ground water storage tank, pump station facility, grading, drainage improvements, driveway, parking lot, utilities. New building square footage: 13,788SF

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1575 Bunton Creek Road, Kyle, TX, 78640

Loading location map…
30.00085, -97.85265

Watch all construction in 78640 (Kyle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.