EMS Medic 3 Renovation
EMS Medic 3 Renovation is a renovation/alteration project at 1305 Red River Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $500K across about 1,265 sq ft.
๐Project Metrics
TDLR #TABS2026003916Review Complete
Design review complete, construction may proceed
EMS Medic 3 Renovation is a Renovation/Alteration project located at 1305 Red River Street, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $500K covering 1,265 sq ft. City of Austin is the property owner and MWM DesignGroup is the design firm of record. The project was registered with TDLR on October 21, 2025.
โFrequently Asked Questions
What is EMS Medic 3 Renovation?
EMS Medic 3 Renovation is a renovation/alteration project at 1305 Red River Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Deferred maintenance improvements to existing EMS station.
Is EMS Medic 3 Renovation open in Austin?
EMS Medic 3 Renovation is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is EMS Medic 3 Renovation located?
EMS Medic 3 Renovation is located at 1305 Red River Street, Austin, TX, 78701, in Travis County.
Who is the owner or developer of EMS Medic 3 Renovation?
City of Austin is the property owner/developer of record for EMS Medic 3 Renovation, per its TDLR project registration.
Who is the architect or design firm for EMS Medic 3 Renovation?
MWM DesignGroup is the design firm of record for EMS Medic 3 Renovation, according to its TDLR filing.
How much does EMS Medic 3 Renovation cost and how big is it?
EMS Medic 3 Renovation has an estimated construction value of $500K and approximately 1,265 square feet (about $395/sqft), based on its TDLR filing.
๐Scope of Work
Deferred maintenance improvements to existing EMS station.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 21, 2025
Review Complete
Feb 6, 2026
Inspection Complete
Closed
108d
Review duration
๐Related Projects
๐คSame Owner
$3.67B total๐Related City Permits
Building permits found at or near this location
Addition of an expanded attached garage with mudroom to side of existing 1-story single family residence.
Upgrade electric service
Rivian Wall EV Charger: Install a new 60-amp circuit in the 200-amp subpanel and route wiring right of the panel to the interior side wall of the garage To the interior right ball of the garage. hardwire the Rivian wall charger and configure to draw up to 48 amps continuous route wire behind the wall per customer instruction-- however if you notice obstructions CAT inhibit this wire like other wire plumbing wall joist please stop what you are doing and alert Tree House. A preference of the customer but we will not sacrifice damaging existing infrastructure for this.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacing inside air handler unit and outside condenser unit. Leaving all ductwork in tact.