Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV
Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV is a renovation/alteration project at 2400 Grove Blvd., Unit EV, Austin, TX 78741, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $550K across about 3,723 sq ft.
๐Project Metrics
TDLR #TABS2026024981Project Registered
Project has been registered with TDLR and is in pre-construction phase
Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV is a Renovation/Alteration project located at 2400 Grove Blvd., Unit EV, Austin, TX 78741, Austin, TX 78741 in Austin, Texas. The project has an estimated value of $550K covering 3,723 sq ft. City of Austin is the property owner and Nora Engineering & Planning LLC is the design firm of record. The project was registered with TDLR on July 10, 2026.
โFrequently Asked Questions
What is Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV?
Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV is a renovation/alteration project at 2400 Grove Blvd., Unit EV, Austin, TX 78741 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site work only. Two new level 3 charging stations in existing parking lot for City of Austin fleet, including repaving for accessible EV parking, striping, electrical lines and appurtenances.
Is Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV open in Austin?
Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV is still under construction in Austin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV located?
Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV is located at 2400 Grove Blvd., Unit EV, Austin, TX 78741, Austin, TX, 78741, in Travis County.
Who is the owner or developer of Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV?
City of Austin is the property owner/developer of record for Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV, per its TDLR project registration.
Who is the architect or design firm for Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV?
Nora Engineering & Planning LLC is the design firm of record for Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV, according to its TDLR filing.
How much does Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV cost and how big is it?
Electrification Infrastructure Phase 5 - 2400 Grove Blvd., Unit EV has an estimated construction value of $550K and approximately 3,723 square feet (about $148/sqft), based on its TDLR filing.
๐Scope of Work
Site work only. Two new level 3 charging stations in existing parking lot for City of Austin fleet, including repaving for accessible EV parking, striping, electrical lines and appurtenances.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 10, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$35.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Commercial rooftop Solar installation 770.18 kw DC.
Foundation Repair
Express: Foundation repair
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Construct 3 new driveway approaches of 80.5 FT (26.8+ 26.8+ 26.9) and sidewalk of 693 LF and curb & gutter of 50 FT. SP-2024-0310CX 2025 038126 000 00 SSI Phase 3- Sheet 6- Closure allowed for 2 Weeks