Zabalist
ZabalistTexas Construction
🏠 Home
📋 Directory
💎 Pricing📊 Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

✓ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

© 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Owners
  6. /
  7. City of Austin
👤
Property Owner96 Active

City of Austin

Financial Service Department, 5202 E Ben White Blv Suite 400, Austin, Texas 78741
Michael Gates
185
Total Projects
$2.54B
Portfolio Value
96
Active Now
18,231,615
Total Sq Ft
1
Cities
$13.7M
Avg Value

About City of Austin

City of Austin is a significant property owner and developer in Austin-Central Texas and Trinity County with a comprehensive real estate portfolio of 185 construction projects valued at $2.54B. The development portfolio includes both new construction and renovations, with 76 new construction projects and 109 renovation projects representing 18,231,615 square feet of developed space.

📊Work Items

  • 76 new construction projects (41%)
  • 109 renovation projects (59%)
  • Average project value: $13.7M
  • Total square footage: 18,231,615 sq ft

🏙️Market Presence

  • Austin185 projects

With 96 active projects currently under development and 89 completed projects, City of Austin maintains a strong presence across 1 cities, working with leading architecture and design firms including HDR, Inc., City of Austin - Public Works Department - Engineering Services Division, CasaBella Architects. The development portfolio is concentrated in Austin, establishing City of Austin as a key player in Austin-Central Texas & Trinity County commercial and residential real estate development.

Market Position

#54
of 0+ Texas property owners
by project volume
Top markets
Austin

Activity Over Time

2020
20
2021
54
2022
25
2023
18
2024
14
2025
25
2026
17
Median project: $929KAvg cost/sqft: $487,544/sqftPeak year: 2021 (54 projects)
🌟 Featured Project🏗️ New

ACCX-C1 , 2025-080245 PR

500 EAST 3RD STREET, Austin, TX 78701
$1.26B1,358,099 sqft
📅

Activity Timeline

First Project
Dec 2018
Latest Project
May 2026
96
Active
89
Completed
📍

Project Locations

Austin
185
Counties
Travis184Trinity1
🏛️

Design Partners

6 architecture firms

1
HDR, Inc.
11 projects·$3.8M·1 active
🏗️ 11 newavg $344K
Austin
Latest:Sidewalk/Ramp Imp. & Signal Installation-William Cannon Dr. at Vega Ave.(Feb 2022)
2
City of Austin - Public Works Department - Engineering Services Division
10 projects·$12.5M
🏗️ 10 newavg $1.2M
Austin
Latest:Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations(May 2021)
3
CasaBella Architects
8 projects·$11.5M·1 active
🔧 8 renoavg $1.4M
Austin
Latest:Harold Court SC11 Restroom-Break Room Addition(Jan 2025)
4
City of Austin
7 projects·$1.7M·2 active
🔧 7 renoavg $247K
Austin
Latest:WPD 12th Floor Reconfiguration, 505 Barton Springs Road(Nov 2022)
5
HDR Engineering, Inc.
6 projects·$22.3M·4 active
🏗️ 3 new🔧 3 renoavg $3.7M
Austin
Latest:Congress Avenue Urban Design Initiative, Congress Avenue 200 Block (2nd St. to 3rd St.)(May 2026)
6
PGAL
6 projects·$294.4M·3 active
🏗️ 4 new🔧 2 renoavg $49.1M
Austin
Latest:AUS WEST GARAGE(Mar 2025)
81 total design firms worked with$2.52B combined
📊

Project Status

🏁Closed
89(48%)
📝Review Complete
64(35%)
📋Registered
22(12%)
✅Inspection Complete
10(5%)

All Projects

185 total · Sorted by date
📋Registered$36.1M

St. John North

845 Blackson Avenue, Austin, TX 78752
May 22, 2026🏗️
L-A-N-D
📋Registered$551K

St John North

910 E St Johns Eve, Austin, TX 78752
May 22, 2026🏗️
L-A-N-D
📋Registered$1.1M

St. John North

910 E. St. Johns Ave, Austin, TX 78752
May 22, 2026🏗️
L-A-N-D
📋Registered$551K

St. John North

910 E St. Johns Ave, Austin, TX 78752
May 22, 2026🏗️
L-A-N-D
📋Registered$22.1M

St. John South

800 E. St Johns Ave, Austin, TX 78752
May 22, 2026🏗️
Meeks + Partners Co
📝Review Complete$900K

AIR General Tenant Improvement

9402 Freight Lane, Austin, TX 78719
May 6, 2026🔧
MPA Architects
📋Registered$530K

Congress Avenue Urban Design Initiative, Congress Avenue 200 Block (2nd St. to 3rd St.)

Congress Avenue 200 Block (2nd St. to 3rd St.), Austin, TX 78701
May 4, 2026🔧
HDR Engineering, Inc.
✅Inspection Complete$50K

Austin-Bergstrom International Airport - Westgate Playground

2500 E STATE HY 71, Austin, TX 78617
Apr 30, 2026🏗️
📝Review Complete$248K

Electrification Infrastructure Phase 5 - 4411 Meinardus Dr. Bldg B

4411 Meinardus Dr. Bldg B, Austin, TX 78744
Apr 29, 2026🔧
Nora Engineering & Planning LLC
📝Review Complete$400K

Electrification Infrastructure Phase 5 - 2412 Kramer Ln Bldg EV1

2412 Kramer Ln Bldg EV1, Austin, TX 78758
Apr 29, 2026🔧
Nora Engineering & Planning LLC
📝Review Complete$3.2M

Community Creative Center

6310 Wilhelmina Delco Dr., Austin, TX 78752
Apr 22, 2026🔧
Marmon Mok Architecture
📝Review Complete$579K

Electrification Infrastructure Phase 5 - 4601 1/2 Meinardus Dr

4601 1/2 Meinardus Dr, Austin, TX 78744, Austin, TX 78744
Apr 15, 2026🔧
Nora Engineering & Planning LLC
📝Review Complete$194K

Electrification Infrastructure Phase 5 - 1600 Grove Blvd

1600 Grove Blvd, Austin, TX 78741, Austin, TX 78741
Apr 15, 2026🔧
Nora Engineering & Planning LLC
📋Registered$55.0M

Project Oasis

3600 Presidential Blvd, Austin, TX 78719
Mar 13, 2026🔧
Corgan Associates, Inc.
📋Registered$1.1M

Slaughter Lane Imp. Project-Bilbrook Pl at Slaughter Ln (C5A-Phase 1 & 2)

Bilbrook Pl and Slaughter Ln, Austin Texas, 78748, Austin, TX 78748
Mar 10, 2026🔧
AECOM
📋Registered$1.4M

Congress Avenue Urban Design Initiative

Congress Avenue 100 Block (Cesar Chavez St. to 2nd St.), Austin, TX 78701
Feb 10, 2026🔧
HDR Engineering, Inc.
📋Registered$2.6M

7th St. & Springdale Rd. Intersection Improvements

7th Street and Springdale Road, Austin, TX 78702
Dec 31, 2025🔧
HDR
📝Review Complete$44.1M

Austin Water Control Center

712 E Huntland Drive, Austin, TX 78721
Nov 21, 2025🔧
Kirksey Architecture
📝Review Complete$500K

EMS Medic 3 Renovation

1305 Red River Street, Austin, TX 78701
Oct 21, 2025🔧
MWM DesignGroup
📋Registered$105K

Slaughter Lane C5- Mary Moore Searight

900 W Slaughter Lane, Austin, TX 78748
Oct 16, 2025🔧
AECOM Technical Services
📝Review Complete$1.7M

City of Austin Ben White Ste 350 Remodel

5202 E. Ben White Blvd. Ste. 350, Austin, TX 78741
Aug 29, 2025🔧
Method Architecture
📝Review Complete$712K

City of Austin Ben White Suite 520 Remodel

5202 E. Ben White Ste. 520, Austin, TX 78741
Aug 29, 2025🔧
Method Architecture
📝Review Complete$850K

Austin Public Library Renovation

7051 Village Center Drive, Austin, TX 78731
Aug 14, 2025🔧
Austin Public Library
📋Registered$630K

Emancipet Manufactured Building Replacement

7201 Levander Loop, Austin, TX 78702
Aug 1, 2025🔧
The Moore Group
📝Review Complete$2.7M

Givens District Park - Recreation Center

3811 E. 12th #1936, Austin, TX 78721
Jul 25, 2025🔧
AtkinsRéalis
📋Registered$1.6M

Little Walnut Creek Branch Library Renovations

835 W. Rundberg Lane, Austin, TX 78758
Jul 1, 2025🔧
MWM DesignGroup
📋Registered$1.6M

Menchaca Road Branch Library Renovations

5500 Menchaca Road, Austin, TX 78745
Jul 1, 2025🔧
MWM DesignGroup
📝Review Complete$1.6M

Howard Lane / Center Line Pass / The Lakes Blvd Intersection Improvements

Howard Lane and Center Line Pass/The Lakes Blvd., Austin, TX 78753
Jun 24, 2025🏗️
Huitt-Zollars
📝Review Complete$291K

Burnet Road at Gault Lane Signal Modifications

2905 1/2 Gault Lane, Austin, TX 78758
Jun 6, 2025🔧
HDR Engineering, Inc.
📝Review Complete$694K

Airport Boulevard - APS Upgrades

1100 to 5300 Airport Boulevard, Austin, TX 78751
May 27, 2025🔧
Kimley-Horn and Associates, Inc.
📝Review Complete$1.8M

E Oltorf St. and Burton Dr. Intersection Improvements

Intersection of E oltorf St and Burton Drive, Austin, TX 78741
May 8, 2025🔧
RPS (Tetra Tech)
📝Review Complete$7.1M

MLK TOD Stormwater Conveyance Improvements Phase 3

Manor Rd. (approx. Walnut Ave. to Alexander Ave.), Austin, TX 78722
May 5, 2025🔧
Freese and Nichols, Inc.
📝Review Complete$24.0M

Lakeline Boulevard

Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln), Austin, TX 78717
Apr 11, 2025🏗️
BinkleyBarfield/DCCM
📝Review Complete$240.0M

AUS WEST GARAGE

2921-1/2 Presidential Blvde, Austin, TX 78617
Mar 21, 2025🏗️
PGAL
📝Review Complete$100K

Hertz AUS UV Eye Installation

3819 Presidential Boulevard, Austin, TX 49546
Mar 12, 2025🔧
Fishbeck
🏁Closed$272K

City of Austin Ben White Ste 550 Remodel

5202 E. Ben White Ste. 550, Austin, TX 78741
Feb 18, 2025🔧
Method Architecture
📝Review Complete$4.0M

Austin Bergstrom International Airport (AUS) Surface Parking Lot H

9309 Rental Car Lane, Austin, TX 78719
Feb 18, 2025🏗️
Garver
📝Review Complete$580K

City of Austin Capital Delivery Services Suite 800

505 Barton Springs Rd. Suite 800 Suite 800, Austin, TX 78704
Feb 12, 2025🔧
Framework Architects
📝Review Complete$560K

City of Austin Capital Delivery Services

505 Barton Springs Rd. Suite 900, Austin, TX 78704
Feb 10, 2025🔧
Framework Architects
📋Registered$20.0M

AUS Atrium Infill

505 E. Huntland Dr, Suite 485, Austin, TX 78752
Feb 6, 2025🔧
Corgan
📝Review Complete$200K

Harold Court SC11 Restroom-Break Room Addition

6209 Harold Court Bldg. 2, Austin, TX 78721
Jan 10, 2025🔧
CasaBella Architects
📝Review Complete$15.4M

Town Lake Center Renovation

721 Barton Springs Road, Austin, TX 78704
Dec 28, 2024🔧
CBRE Design Collective, Inc.
📝Review Complete$5.8M

Mokan Corridor Trail 5 Boggy Creek Bridge

Gunter/Sellers-Lyons thru City Prop 812 Springdale, Austin, TX 78702
Dec 12, 2024🏗️
Walker Partners, LLC
📝Review Complete$300K

Pedestrian Hybrid Beacon Airport Blvd. at 55th Street

E 55th St. and Airport Blvd., Austin, TX 78751
Nov 20, 2024🏗️
Halff Associates, Inc.
📝Review Complete$852K

Collinfield/Mearns Meadow at Rundberg Intersection Improvements

Intersection of Rundberg Ln at Collinfield Dr/Mear, Austin, TX 78758
Nov 15, 2024🔧
Consor Engineers
📝Review Complete$1.8M

Burleson at Stassney/Montopolis Intersection Improvements

ntersection of Burleson Rd at Stassney Ln/Montopol, Austin, TX 78744
Nov 15, 2024🔧
Consor Engineers
📝Review Complete$7.4M

Airport Blvd. Section C2 45th Street to MLK Jr. Blvd

1900 to 4500 Airport Blvd., Austin, TX 78722
Oct 17, 2024🔧
Halff Associates
📝Review Complete$2.0M

Airport Blvd. Section C5 Mokan Trail Bridge to US183

500 to 1100 Airport Blvd., Austin, TX 78702
Oct 17, 2024🔧
Halff Associates
📝Review Complete$4.6M

Airport Blvd. Section C3 MLK Jr. Blvd to Springdale Rd

1120 to 1900 Airport Blvd., Austin, TX 78702
Oct 17, 2024🔧
Halff Associates
🏁Closed$2.2M

Airport Blvd. Section C1A - 46th Street to Middle Fiskville Road

4600 to 5600 Airport Blvd, Austin, TX 78751
Oct 11, 2024🔧
Halff Associates
🏁Closed$120K

Electrification Infrastructure Phase 4 - 5010 Old Manor Road

5010 Old Manor Road,, Austin, TX 78723
Aug 20, 2024🔧
Nora Engineering & Planning LLC
🏁Closed$64K

Trail Safety Improvements at Waller Beach - Sidewalk

28 East Avenue, Austin, TX 78701
Jul 19, 2024🏗️
City of Austin Parks and Recreation
📋Registered$3.0M

FY 23 SBO SIdewalk Rehab projects

505 Barton Springs Rd., Austin, TX 78701
Jun 6, 2024🔧
Pape-Dawson
🏁Closed$850K

Waller Creek Center Parking Garage Renewal

625 East 10th Street, Austin, TX 78701
Apr 16, 2024🔧
BLGY Architecture
✅Inspection Complete$96K

AFD Wellness Center Parking Improvements

517 South Pleasant Valley Road, Austin, TX 78741
Feb 17, 2024🔧
BGE, Inc.
🏁Closed$300K

McBeth Recreation Center - Playground Replacement

2401 Columbus Drive, Austin, TX 78746
Sep 26, 2023🔧
City of Austin Parks and Recreation
🏁Closed$4.2M

Mueller - Control Tower Park

3925 Berkman Dr., Austin, TX 78723
Sep 15, 2023🏗️
Studio Balcones
📝Review Complete$4.5M

South Pleasant Valley Road Gap 1

3104 Burleson Rd, Austin, TX 78741
Aug 18, 2023🏗️
Kimley-Horn and Associates, Inc
📝Review Complete$29.3M

Guad-C3.003 24th St - N. Lamar Blvd. to Guadalupe St.

1400 W 24th St to 399 W 24th St, Austin, TX 78705
Aug 17, 2023🏗️
Binkley & Barfield | DCCM
🏁Closed$11.0M

Canyon Creek Fire & EMS Station

9804 N FM 620 Road, Austin, TX 78726
Jun 13, 2023🏗️
PGAL
🏁Closed$1.2M

E Riverside Dr Intersection Improvements

From Tinnin Ford Rd to Coriander Dr, Austin, TX 78741
Jun 7, 2023🔧
Kimley-Horn
🏁Closed$748K

High Crash Intersections Project Task 2, CSJ: 0914-04-331, etc.

6712 Burleson Road, etc., Austin, TX 78744
May 24, 2023🏗️
HDR Engineering, Inc.
🏁Closed$181K

MILLENNIUM ACTIVITY CENTER A.D.A. RENOVATIONS

1156 HARGRAVE ST, Austin, TX 78702
May 12, 2023🔧
MWM DESIGNGROUP
📝Review Complete$9.3M

Barton Springs Bathhouse Rehabilitation

2131 William Barton Drive, Austin, TX 78746
Mar 27, 2023🔧
Limbacher & Godfrey Architects, Inc
📋Registered$13.4M

Airport Boulevard: Segment C1A from 45th St. to 55th St.

4511 to 5621 Airport Blvd., Austin, TX 78751
Mar 20, 2023🏗️
Halff Associates, Inc.
📝Review Complete$22.0M

East Braker Lane Extension

Braker Ln. at Dawes Place, Austin, TX 78754
Mar 17, 2023🏗️
City of Austin Engineering Services Division
🏁Closed$100K

ABIA - DNC - Medici

3600 Presidential Blvd, Austin, TX 78719
Mar 16, 2023🔧
Rittiluechai Architecture, PC
📋Registered$19.1M

Burnet Road Corridor - Bright Verde Way to Loop 1

10500 - 11900 Burnet Road, Austin, TX 78758
Jan 27, 2023🏗️
HDR Engineering, Inc.
📝Review Complete$51K

TSA SEDS 70T04021D7672N003 CHP2E

3600 Presidential Blvd, Austin, TX 78719
Jan 20, 2023🔧
Lockwood, Andrews & Newman, Inc.
📝Review Complete$80K

TSA SEDS 70T04021D7672N003 CHP3

3600 Presidential Blvd, Austin, TX 78719
Jan 20, 2023🔧
Lockwood, Andrews & Newman, Inc.
📝Review Complete$156K

TSA SEDS 70T04021D7672N003 CHP1

3600 Presidential Blvd, Austin, TX 78719
Jan 20, 2023🔧
Lockwood, Andrews & Newman, Inc.
🏁Closed$2.9M

George Washington Carver Museum Theater & Accessibility Improvements

1165 Angelina St., Austin, TX 78702
Jan 18, 2023🔧
CasaBella Architects
📝Review Complete$13.0M

Burnet Road Corridor - US 183 to Bright Verde Way

Burnet Rd from US 183 to Bright Verde Way, Austin, TX 78757
Jan 9, 2023🔧
Kimley-Horn
📝Review Complete$240K

WPD 12th Floor Reconfiguration, 505 Barton Springs Road

505 Barton Springs Road, Austin, TX 78745
Nov 30, 2022🔧
City of Austin
📝Review Complete$2.0M

North Lamar Boulevard Corridor - Parmer Lane to Howard Land IFB

N Lamar Blvd from Parmer Ln to Howard Ln, Austin, TX 78753
Oct 18, 2022🔧
Freese and Nichols, Inc.
🏁Closed$2.3M

North Lamar Boulevard Corridor - Parmer Lane to Howard Lane IDIQ

N Lamar Blvd from Parmer Ln to Howard Ln, Austin, TX 78753
Oct 18, 2022🔧
Freese and Nichols, Inc.
📋Registered$21.4M

North Lamar Boulevard Corridor (C2)

South of Meadowlark St to South of Rundberg Ln, Austin, TX 78753
Sep 22, 2022🔧
Kimley-Horn
🏁Closed$780K

Tannehill Creek Trail

2101 East 51st St, Austin, TX 78723
Aug 5, 2022🏗️
RVi Planning + Landscape Architecture
🏁Closed$10.0M

Burnet Road Corridor - AE Kramer Site Drainage

2526 Kramer Lane, Austin, TX 78757
Jul 29, 2022🏗️
CDM Smith
📝Review Complete$1.5M

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package

From 205 1/2 to 1215 1/2 - W Slaughter Lane, Austin, TX 78748
Jul 18, 2022🔧
AECOM Technical Services, Inc.
🏁Closed$640K

WPD 11th Floor Reconfiguration, 505 Barton Springs Road

505 Barton Springs Road, Austin, TX 78745
Jul 13, 2022🔧
City of Austin
🏁Closed$150K

Bull Creek District Park Restroom Renovation

6899 Lakewood Dr, Austin, TX 78731
Jun 29, 2022🔧
Stanley Studio
🏁Closed$12.7M

Faulk Building and History Center Renovation

800 Guadalupe St, Austin, TX 78701
Jun 21, 2022🔧
📝Review Complete$428K

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package C

2113 W. Slaughter Lane, Austin, TX 78748
Jun 18, 2022🔧
AECOM
📋Registered$8.8M

Burnet Road Corridor - AE Kramer Site Drainage

2526 Kramer Lane, Austin, TX 78757
Jun 16, 2022🏗️
CDM Smith
📝Review Complete$385K

SOLA-C3.005 Intersection Improvements

1209 W. Mary St., Austin, TX 78704
Jun 9, 2022🔧
BGE, Inc.
🏁Closed$566K

Signal and Sidewalk/Ramp Improvements - Slaughter Lane at Stillwaters Apartments

517 ½ E Slaughter Lane, Austin, TX 78744
May 24, 2022🔧
HDR Inc.
📝Review Complete$29.3M

SOLA-C2.003 Barton Springs Rd. to US 290

500 - 4000 S.. Lamar Blvd., Austin, TX 78704
May 20, 2022🔧
BGE, Inc.
📝Review Complete$15.3M

Burnet Road Corridor - White Horse Trail to US 183

Burnet Rd from Koenig Lane to US 183, Austin, TX 78757
Apr 18, 2022🔧
Kimley-Horn
🏁Closed$648K

Safety Improvements Projects

Congress Ave at Ramble Lane, etc., Austin, TX 78745
Apr 7, 2022🏗️
AECOM Technical Service
📝Review Complete$160K

505 Barton Springs Road, Suite 730 WPD HR Office Reconfiguration

505 Barton Springs Road, Austin, TX 78704
Mar 21, 2022🔧
City of Austin
📝Review Complete$2.0M

Zilker Clubhouse Rehabilitation

200 Arnulfo Alonso Way, Austin, TX 78704
Mar 15, 2022🔧
Limbacher & Godfrey Architects
✅Inspection Complete$2.5M

Austin Fire Station 01 / EMS 06 Renovation and Addition

401 East 5th Street, Austin, TX 78701
Feb 21, 2022🔧
WestEast Design Group LLC
✅Inspection Complete$6.0M

Austin Fire Station 22 / EMS 12 Renovation and Addition

5309 E Riverside Dr, Austin, TX 78741
Feb 18, 2022🔧
WestEast Design Group LLC
🏁Closed$409K

Sidewalk/Ramp Imp. & Signal Installation-William Cannon Dr. at Vega Ave.

6500 1/2 W William Cannon Dr., Austin, TX 78735
Feb 10, 2022🏗️
HDR, Inc.
✅Inspection Complete$409K

Sidewalk/Ramp Imp. & Signal Installation-William Cannon Dr. at Rialto Blvd.

7100 1/2 W William Cannon Dr., Austin, TX 78735
Feb 10, 2022🏗️
HDR, Inc.
🏁Closed$467K

PHB on Airport Blvd at 40th Street

4001 1/2 Airport Blvd, Austin, TX 78722
Feb 10, 2022🏗️
Halff Associates
🏁Closed$72K

8th Floor SSPD Reconfiguration

505 Barton Springs Road, Austin, TX 78704
Jan 12, 2022🔧
City of Austin
📝Review Complete$95K

United Airlines Lobby Refresh

3600 Presidential Blvd., Austin, TX 78719
Dec 17, 2021🔧
Gensler
📝Review Complete$246K

SOLA-C3.005 Intersection Improvements - Blue Bonnet Lane and Del Curto Road

2403 Del Curto Rd., Austin, TX 78704
Dec 17, 2021🔧
BGE, Inc.
✅Inspection Complete$10.9M

Airport Boulevard: Segment C1 from 55th St. to N. Lamar Blvd.

5500 1/2 to 6929 Airport Blvd., Austin, TX 78751
Dec 9, 2021🔧
Halff Associates
🏁Closed$1.4M

Burnet Road Corridor - Koenig Lane Intersection to White Horse Trail

5900 - 6300 Burnet Road, Austin, TX 78757
Nov 17, 2021🏗️
CDM Smith
🏁Closed$7.9M

Austin to Manor Phase 2 (Urban Trail)

Walter E Long Park, Austin, TX 78724
Nov 16, 2021🏗️
AECOM
📝Review Complete$425K

GUAD-C4.007 Guadalupe St - North of E MLK to 29th St

Multiple locations throughout the city, Austin, TX 78705
Nov 11, 2021🏗️
Binkley & Barfield
🏁Closed$1.2M

Austin Fire Station 03 Renovation and Addition

201 West 30th Street, Austin, TX 78705
Oct 27, 2021🔧
WestEast Design Group LLC
🏁Closed$1.7M

Austin Fire Department - Locker Room Project Phase 6

2804 Montebello Road, Austin, TX 78746
Oct 20, 2021🔧
CasaBella Architects
🏁Closed$500K

Delta TechOps

3600 Presidential Blvd., Austin, TX 78719
Sep 28, 2021🏗️
Gensler
🏁Closed$2.9M

Northern Walnut Creek Hike and Bike Trail Phase II

12138 N. Lamar Blvd., Austin, TX 78753
Sep 21, 2021🏗️
RPS
📝Review Complete$5.3M

Bergstrom Spur Urban Trail Central Segment

Bergstrom Spur, Austin, TX 78701
Sep 20, 2021🏗️
📋Registered$200K

Austin PD RTCC Buildout

715 8th Street, Austin, TX 78701
Sep 7, 2021🔧
PGAL
🏁Closed$1.5M

Austin Fire Department - Locker Room Project Phase 6

4800 Shaw Lane, Austin, TX 78744
Aug 20, 2021🔧
CasaBella Architects
🏁Closed$490K

Turner Roberts Recreation Center Storm Damage

7201 Colony Loop Drive, Austin, TX 78724
Aug 4, 2021🔧
Casabella-Architects.com
🏁Closed$312K

PHB on William Cannon Drive at Stephenson Nature Preserve

3014 1/2 W William Cannon Drive, Austin, TX 78745
Jul 26, 2021🏗️
HDR, Inc.
🏁Closed$312K

PHB on William Cannon Drive at Lost Valley

3400 1/2 W William Cannon Drive, Austin, TX 78745
Jul 26, 2021🏗️
HDR, Inc.
🏁Closed$321K

PHB on William Cannon Drive at Onion Creek Soccer Complex

5590 1/2 E William Cannon Drive, Austin, TX 78744
Jul 22, 2021🏗️
HDR, Inc.
🏁Closed$340K

PHB on Airport Boulevard, south of Oak Springs Drive

1146 1/2 Airport Boulevard, Austin, TX 78702
Jul 22, 2021🏗️
HDR, Inc.
🏁Closed$300K

PHB on William Cannon Drive at McCarty Lane

5120 1/2 W William Cannon Drive, Austin, TX 78749
Jul 22, 2021🏗️
HDR, Inc.
🏁Closed$244K

PHB on Airport Boulevard south of Harvey Street

1181 1/2 Airport Boulevard, Austin, TX 78702
Jul 22, 2021🏗️
HDR, Inc.
📝Review Complete$244K

Sidewalk/Ramp Improvements and Signal Modification - IH 35 and E Riverside Drive

1300 1/2 E Riverside Drive, Austin, TX 78741
Jul 22, 2021🏗️
Kimley-Horn & Associates
🏁Closed$321K

PHB on William Cannon Drive at Rockridge Drive

4500 1/2 E William Cannon Drive, Austin, TX 78744
Jul 22, 2021🏗️
HDR, Inc.
🏁Closed$340K

PHB on Airport Boulevard at Gunter Street

1138 1/2 Airport Boulevard, Austin, TX 78702
Jul 22, 2021🏗️
HDR, Inc.
🏁Closed$479K

PHB on Slaughter Lane at Vinemont Drive

6230 1/2 W Slaughter Lane, Austin, TX 78749
Jul 22, 2021🏗️
HDR, Inc.
📝Review Complete$360K

Transportation Safety and Mobility Improvements IDIQ - W Stassney Lane

W Stassney Ln from Lewood Dr to S Congress, Austin, TX 78745
Jul 14, 2021🔧
RPS
🏁Closed$339K

PHB on Burnet Road at Twin Oaks Drive

6610 1/2 Burnet Rd., Austin, TX 78757
Jul 10, 2021🏗️
HDR Inc.
🏁Closed$317K

PHB on Burnet Road at Penny Ln./Doris Dr.

8400 1/2 Burnet Rd., Austin, TX 78757
Jul 10, 2021🏗️
HDR Inc.
🏁Closed$120K

Transportation Safety and Mobility Improvements IDIQ - St. Johns Ave. and Blessing Ave.

E. St. Johns Ave at Blessing Ave., Austin, TX 78752
Jun 23, 2021🔧
RPS
🏁Closed$251K

BURN PED IDIQ White Horse SUP

5900 - 6300 Burnet Road, Austin, TX 78757
Jun 21, 2021🏗️
HDR Engineering, Inc.
🏁Closed$130K

BURN PED IDIQ Twin Oaks SUP

6701 Burnet Road, Austin, TX 78757
Jun 21, 2021🏗️
Garza EMC
🏁Closed$55K

10th Floor Reconfiguration, Phase 10A

505 Barton Springs Road, Austin, TX 78704
Jun 17, 2021🔧
City of Austin
🏁Closed$14.7M

City of Austin Davenport Ranch Fire and EMS Station

6500 St Stephens School Rd, Austin, TX 78746
May 26, 2021🏗️
PGAL Architects - Austin
🏁Closed$2.7M

Meadow Lake Blvd Street Extension - CIP No. 6319.014

Meadow Lake Blvd, Austin, TX 78744
May 26, 2021🏗️
Dunaway Associates
🏁Closed$82K

Patton Elementary School Roadway Improvements

Intersections Summerset/Brush Country, Westcreek/H, Austin, TX 78749
May 17, 2021🔧
Pape-Dawson Engineers
🏁Closed$61K

9th Floor Break Room

505 Barton Springs Road, Austin, TX 78704
May 14, 2021🔧
City of Austin
🏁Closed$929K

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

4912 ½ S. Congress Ave, Austin, TX 78745
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$929K

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

3923 ½ Red River St, Austin, TX 78751
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$929K

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

8821 ½ Burnet Rd., Austin, TX 78757
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$1.7M

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

5808 ½ S. 1st St, Austin, TX 78745
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$1.7M

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

2401 1/2 S. Pleasant Valley Rd., Austin, TX 78741
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$929K

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

7200 ½ Blessing Ave (St. Johns Ave @ Blessing Ave), Austin, TX 78752
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$929K

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

6701 ½ Sandshof Dr (Loyola Ln @ Sandshof Dr), Austin, TX 78724
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$929K

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

209 1/2 W. Rundberg Lane (Rundberg Ln @ Slayton Dr, Austin, TX 78753
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$1.7M

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

7001 ½ Cameron Rd (Cameron Rd @ Westheimer Dr.), Austin, TX 78752
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$1.7M

Pedestrian Safety & Transit Connections - 2017 CAMPO Grant - PHB Installations

910 1/2 E. St. Johns Ave., Austin, TX 78752
May 12, 2021🏗️
City of Austin - Public Works Department - Engineering Services Division
🏁Closed$2.6M

EMS 10 / AFD 25 ADDITIONS & RENOVATIONS

5228 DUVAL RD., Austin, TX 78727
May 10, 2021🔧
MWM DESIGN GROUP
✅Inspection Complete$1.9M

EMS 7 / AFD 8 ADDITIONS & RENOVATIONS

8989 Research Blvd, Austin, TX 78758
May 10, 2021🔧
MWM DESIGN GROUP
✅Inspection Complete$534K

COA Auditors Group

505 Barton Springs Road, Suite 200, Austin, TX 78704
May 7, 2021🔧
🏁Closed$750K

Million Air Austin Hangar 6 Tenant Improvement

4801 Emma Browning Ave, Hangar 6, Austin, TX 78719
May 7, 2021🔧
Merriman Pitt / Anderson, Inc
🏁Closed$150K

RBJ Bathrooms

15 Waller St., Austin, TX 78702
May 4, 2021🔧
Method Architecture
📝Review Complete$1.6M

East Riverside Drive C1 Traffic Signal Improvements

From Montopolis Dr to SH 71, Austin, TX 78741
May 3, 2021🔧
Kimley-Horn
📝Review Complete$1.3M

East Riverside Drive C1 Roadway Improvements

From Montopolis Dr to SH 71, Austin, TX 78741
May 3, 2021🔧
Kimley-Horn
✅Inspection Complete$320K

Sidewalk Replacement Associated with Brentwood Water and Wastewater Pipeline Renewal Plans

6400-6616 Grover Ave; 1200-1318 Arcadia Ave; 821-1109 Brentwood St, Austin, TX 78757
Apr 15, 2021🏗️
RPS Infrastructure, Inc.
🏁Closed$7.7M

Canterbury at Mildred Emergency Repair Project

Canterbury St. from Mildred St. to Clara St. & Mildred St. from Holly St. to Willow St., Austin, TX 78702
Jan 14, 2021🔧
Halff Associates, Inc.
🏁Closed$1.9M

EMS 01 Additions and Renovations

3616 S 1st Street, Austin, TX 78704
Dec 16, 2020🔧
MWM Design Group
🏁Closed$1.6M

EMS 13/AFD 23 Additions and Renovations

1334 E Rundberg Lane, Austin, TX 78753
Dec 16, 2020🔧
MWM Design Group
🏁Closed$2.7M

EMS 05 Additions and Renovations

5710 North Lamar Blvd, Austin, TX 78752
Dec 16, 2020🔧
MWM Design Group
🏁Closed$9.0M

Boggy Creek - MLK TOD Stormwater Conveyance Improvements Phase 2

2800 E. MLK, Jr. Blvd., Austin, TX 78702
Oct 16, 2020🔧
Freese and Nichols, Inc.
🏁Closed$1.6M

Austin Fire Department Station #9-Locker Room Project Phase 6

4301 Speedway, Austin, TX 78751
Sep 15, 2020🔧
CasaBella Architects
🏁Closed$1.8M

Austin Fire Department Station #11 - Locker Room Project Phase 6

1611 Kinney Avenue, Austin, TX 78704
Aug 12, 2020🔧
CasaBella Architects
🏁Closed$750K

ADA Ramp and Bus Stop Improvements 2020 – 2023 City Wide IDIQ

City Wide. (Location #1 Grove Blvd & Hogan Ave), Austin, TX 78741
Jul 29, 2020🔧
Engineering Service Division, COA
🏁Closed$5.4M

Northern Walnut Creek Hike & Bike Trail Phase 2

12138 N Lamar Blvd, Austin, TX 78753
Jul 17, 2020🏗️
RPS
📝Review Complete$515K

Guadalupe St Corridor Improvements - Contraflow

Multiple locations throughout the city, Austin, TX 78701
Jun 2, 2020🏗️
Binkley & Barfield
📝Review Complete$265K

Guadalupe St Corridor IDIQ Phase 2

Multiple locations throughout the city, Austin, TX 78705
May 12, 2020🏗️
Binkley and Barfield
🏁Closed$500K

Harold Court Modular Bldg

6301 Harold Court, Austin, TX 78721
May 11, 2020🏗️
Lawrence Group Austin
🏁Closed$28.0M

City of Austin Convention Center Warehouse & Marshalling Yard

1400 Airport Commerce Drive, Austin, TX 78741
May 11, 2020🏗️
PGAL
📝Review Complete$16.6M

Little Walnut Creek Flood Risk Reduction

1100 Rutland Drive, Austin, TX 78758
May 4, 2020🔧
BGE
📝Review Complete$1.0M

Local Mobility ADA Sidewalk and Ramp Improvement Group 22A City Wide - IDIQ

Locations throughout city, Austin, TX 78701
Apr 24, 2020🏗️
RPS Group
📝Review Complete$7.0M

Local Mobility ADA Sidewalk and Ramp Improvement Group 25 City Wide - IDIQ

Various locations throughout city, Austin, TX 78701
Apr 24, 2020🏗️
RPS Group
📝Review Complete$6.0M

Local Mobility ADA Sidewalk and Ramp Improvement Group 23A City Wide - IDIQ

Various locations throughout city, Austin, TX 78701
Apr 24, 2020🏗️
RPS Group
🏁Closed$11.0M

City of Austin Fire & EMS Station - Travis Country

5410 W US 290 HWY SVRD WB, Austin, TX 78735
Apr 14, 2020🏗️
PGAL Architects
📝Review Complete$4.0M

ABIA Elevator Refurbishment - Phase 2

3600 Presidential Drive, Austin, TX 78719
Feb 20, 2020🔧
RS&H,inc
🏁Closed$72K

Bolm Road PS&E

Bolm Rd., between Airport Blvd. and Shady Ln., Austin, TX 78721
Feb 18, 2020🏗️
HDR Engineering
🏁Closed$736K

O. Henry Museum Restoration

409 E. 5th St., Austin, TX 78701
Feb 4, 2020🔧
Limbacher & Godfrey Architects
🏁Closed$500K

Comal Pocket Park Renovations

300 Comal Street, Austin, TX 78702
Oct 17, 2019🔧
City of Austin
🏁Closed$865K

Austin Fire Department Station #12 - Locker Room Project Phase 6

2109 Hancock Dr., Austin, TX 78756
Aug 29, 2019🔧
CasaBella Architects
🏁Closed$185K

Guadalupe St Corridor ADA Sidewalks & Ramp Improvements IDIQ Phase 1

Multiple locations throughout the City of Austin, Austin, TX 78705
Aug 28, 2019🏗️
Binkley and Barfield
🏁Closed$195.0M

Austin FC

10414 McKalla Place, Austin, TX 78758
Aug 8, 2019🏗️
Gensler
🏁Closed$775K

Castleman-Bull House Exterior Restoration

201 Red River Street, Austin, TX 78701
Aug 5, 2019🔧
Limbacher & Godfrey, Inc.
🏁Closed$930K

Austin Fire Department Station #16 - Locker Room Project Phase 6

7000 Reese Lane, Austin, TX 78757
Jul 16, 2019🔧
CasaBella Architects
🏁Closed$103.5M

Catellus Commercial Office Development

4815 Mueller Blvd., Austin, TX 78723
Jul 1, 2019🏗️
Page Southerland Page, Inc.
🏁Closed$10.5M

City of Austin Del Valle Fire EMS Station

7019 Elroy Rd, Austin, TX 78617
May 21, 2019🏗️
PGAL
🏁Closed$150K

Spirit Airlines Office Build-Out

3600 Presidential Blvd, Suite 2806, Austin, TX 78719
May 14, 2019🔧
GLMV Architecture
🏁Closed$450K

5th Street Garage Tenant Finish Out

413 Red River Street, Austin, TX 78701
Jan 31, 2019🔧
MWM Design Group
✅Inspection Complete$4.7M

New Employment Center

2800 Spirit of Texas, Austin, TX 78719
Jan 30, 2019🔧
PGAL
🏁Closed$950K

Barbra Jordan Terminal Expansion - Phase 1

Barbara Jordan Terminal, Austin, TX 78719
Dec 21, 2018🔧
UAP North America, LTD, Janet Zweig LLC
All OwnersExplore Projects