Project intelligenceTDLR TABS2022023962Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package in Austin, TX

From 205 1/2 to 1215 1/2 - W Slaughter Lane, Austin, TX, 78748

Target date passed (Jun 2023)Review Complete

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package is a renovation/alteration project at From 205 1/2 to 1215 1/2 - W Slaughter Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.5M across about 101,911 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
101,911 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$15/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 18, 2022329 days across supplied datesJun 12, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    316 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78748 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package is a Renovation/Alteration project located at From 205 1/2 to 1215 1/2 - W Slaughter Lane, Austin, TX 78748 in Austin, Texas. The project has an estimated value of $1.5M covering 101,911 sq ft. City of Austin is the property owner and AECOM Technical Services, Inc. is the design firm of record. The project was registered with TDLR on July 18, 2022.

Frequently Asked Questions

What is Signal and Sidewalk/Ramp Improvements - SLGT-IA Package?

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package is a renovation/alteration project at From 205 1/2 to 1215 1/2 - W Slaughter Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Modification of vehicle and pedestrian traffic signals, replacement of pedestrian access ramps and pavement markings at Slaughter Lane Intersections with Texas Oaks Dr, United Kingdom Drive, Palace Parkway, Southpark Meadows Dr, and Alic…

Is Signal and Sidewalk/Ramp Improvements - SLGT-IA Package open in Austin?

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package was scheduled to finish construction in Jun 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Signal and Sidewalk/Ramp Improvements - SLGT-IA Package located?

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package is located at From 205 1/2 to 1215 1/2 - W Slaughter Lane, Austin, TX, 78748, in Travis County.

Who is the owner or developer of Signal and Sidewalk/Ramp Improvements - SLGT-IA Package?

City of Austin is the property owner/developer of record for Signal and Sidewalk/Ramp Improvements - SLGT-IA Package, per its TDLR project registration.

Who is the architect or design firm for Signal and Sidewalk/Ramp Improvements - SLGT-IA Package?

AECOM Technical Services, Inc. is the design firm of record for Signal and Sidewalk/Ramp Improvements - SLGT-IA Package, according to its TDLR filing.

How much does Signal and Sidewalk/Ramp Improvements - SLGT-IA Package cost and how big is it?

Signal and Sidewalk/Ramp Improvements - SLGT-IA Package has an estimated construction value of $1.5M and approximately 101,911 square feet (about $15/sqft), based on its TDLR filing.

Scope of Work

Modification of vehicle and pedestrian traffic signals, replacement of pedestrian access ramps and pavement markings at Slaughter Lane Intersections with Texas Oaks Dr, United Kingdom Drive, Palace Parkway, Southpark Meadows Dr, and Alice Mae Lane

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From 205 1/2 to 1215 1/2 - W Slaughter Lane, Austin, TX, 78748

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78748 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.