Mokan Corridor Trail 5 Boggy Creek Bridge
๐Project Metrics
TDLR #TABS2025007563Review Complete
Design review complete, construction may proceed
๐Scope of Work
274 LF of a 12-ft wide concrete urban trail and 225 LF of a prefabricated metal pedestrian bridge including trail lighting; grading; pavement repair; drainage modifications; and all necessary appurtenances.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$45.4M total๐Related City Permits
Building permits found at or near this location
Replacement of any self-contained packaged units Replacing 7-ton Addison with new like-for-like 7-ton Addison.
Install new laboratory fume hood system and associated controls in the Forensics Toxicology Lab at Austin Police Department East Substation
Install new laboratory fume hood system and associated controls in the Forensics Toxicology Lab at Austin Police Department East Substation
Install new laboratory fume hood system and associated controls in the Forensics Toxicology Lab at Austin Police Department East Substation
Replace 4 small boilers for Forensics
๐Related Site Plans
City of Austin site plan approvals at this location