MLK TOD Stormwater Conveyance Improvements Phase 3
Manor Rd. (approx. Walnut Ave. to Alexander Ave.), Austin, TX, 78722
MLK TOD Stormwater Conveyance Improvements Phase 3 is a renovation/alteration project at Manor Rd. (approx. Walnut Ave. to Alexander Ave.), Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2028. The project has an estimated value of $7.1M across about 4,268 sq ft.
- Estimated project value
- $7.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,268 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.66K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
392 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
792 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78722 (Austin)
One email per change. Unsubscribe in one click. Privacy.
MLK TOD Stormwater Conveyance Improvements Phase 3 is a Renovation/Alteration project located at Manor Rd. (approx. Walnut Ave. to Alexander Ave.), Austin, TX 78722 in Austin, Texas. The project has an estimated value of $7.1M covering 4,268 sq ft. City of Austin is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on May 5, 2025.
Frequently Asked Questions
What is MLK TOD Stormwater Conveyance Improvements Phase 3?
MLK TOD Stormwater Conveyance Improvements Phase 3 is a renovation/alteration project at Manor Rd. (approx. Walnut Ave. to Alexander Ave.) in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes installation of storm drain, water line, and sanitary sewer along 1200 LF of Manor Rd and adjacent side streets, ~4,268 SY (0.88 acres) full depth roadway reconstruction/mill and overlay, curb and gutter, and sidewalk.
Is MLK TOD Stormwater Conveyance Improvements Phase 3 open in Austin?
MLK TOD Stormwater Conveyance Improvements Phase 3 is still under construction in Austin, TX, with an estimated completion of Aug 2028 according to its TDLR registration.
Where is MLK TOD Stormwater Conveyance Improvements Phase 3 located?
MLK TOD Stormwater Conveyance Improvements Phase 3 is located at Manor Rd. (approx. Walnut Ave. to Alexander Ave.), Austin, TX, 78722, in Travis County.
Who is the owner or developer of MLK TOD Stormwater Conveyance Improvements Phase 3?
City of Austin is the property owner/developer of record for MLK TOD Stormwater Conveyance Improvements Phase 3, per its TDLR project registration.
Who is the architect or design firm for MLK TOD Stormwater Conveyance Improvements Phase 3?
Freese and Nichols, Inc. is the design firm of record for MLK TOD Stormwater Conveyance Improvements Phase 3, according to its TDLR filing.
How much does MLK TOD Stormwater Conveyance Improvements Phase 3 cost and how big is it?
MLK TOD Stormwater Conveyance Improvements Phase 3 has an estimated construction value of $7.1M and approximately 4,268 square feet (about $1.66K/sqft), based on its TDLR filing.
Scope of Work
The project includes installation of storm drain, water line, and sanitary sewer along 1200 LF of Manor Rd and adjacent side streets, ~4,268 SY (0.88 acres) full depth roadway reconstruction/mill and overlay, curb and gutter, and sidewalk.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Manor Rd. (approx. Walnut Ave. to Alexander Ave.), Austin, TX, 78722
Related Projects
Same Owner
$3.67B totalWatch all construction in 78722 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.