Local Mobility ADA Sidewalk and Ramp Improvement Group 23A City Wide - IDIQ
๐Project Metrics
TDLR #TABS2020016221Review Complete
Design review complete, construction may proceed
๐Scope of Work
idewalks, ramps, driveways, retaining walls, handrails, bike paths, striping, shoulder widening, bus stop ADA upgrades, sidewalk repairs and associated construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$45.4M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
A service meter will be installed for the Small Cell node located on this traffic signal. This will be an underground service. INSTALL METER LOOP TO VERIZON OWN SMALL CELL PERMIT #2020-163864-000-00-SCP
Replacement of three RTUs at Travis Co Precinct 5 Constables office
Replacement of complete existing central heat and air system with or without duct work One RTU Trane replacement for Travis County Holt Bldg. Suite 1003
Interior Remodel to existing Admn/Bus/Prof Offices
Interior Remodel to existing Admn/Bus/Prof Offices
๐Related Site Plans
City of Austin site plan approvals at this location