Airport Boulevard: Segment C1A from 45th St. to 55th St.

4511 to 5621 Airport Blvd., Austin, TX, 78751

Target date passed (Sep 2024)Project Registered

Airport Boulevard: Segment C1A from 45th St. to 55th St. is a new construction project at 4511 to 5621 Airport Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $13.4M across about 850,210 sq ft.

Estimated project value
$13.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
850,210 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$16/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 20, 2023544 days across supplied datesSep 14, 2024

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    165 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    379 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Airport Boulevard: Segment C1A from 45th St. to 55th St.

Airport Boulevard from E 45th St to Middle Fiskville Rd. is a new construction project in Austin, Texas. The filing identifies this specific work as "Airport Boulevard: Segment C1A from 45th St. to 55th St." The project covers an area of 850,210 square feet in the Windsor Park neighborhood of Travis County. The City of Austin is the owner of record, and the estimated cost is $13,405,550.

Halff Associates, Inc. is the design firm of record for this roadway improvement. The scope of work includes intersection improvements, extensive access management implementation, and drainage upgrades. The plan also calls for water and wastewater relocation, traffic signal upgrades, and pedestrian hybrid beacons. Additional elements include median installation, shared use paths, bike lanes, and pavement improvements.

Project Status and Timeline

The project was registered with TDLR in March 2023 with a target completion date of September 2024. The scheduled build window is 379 days. Although the target completion date has passed, no plan review or inspection has been recorded since registration. Consequently, whether the project proceeded to completion is not confirmed in the public record. The TDLR status remains Project Registered.

This project involves public funds, public land, or is a Federally funded roadway project. The estimated cost of $13,405,550 is above the county median for new construction filings in Travis County. The $16 per square foot cost is below the county median of $125 per square foot. The 379-day build window is close to the county median of 304 days.

The City of Austin has six other TDLR-registered projects totaling $4,265,000. These include work at Austin-Bergstrom International Airport, Rundberg Lane, E Oltorf Street, E 7th Street, and Cameron Road. Halff Associates, Inc. has six other registered projects totaling $4,687,000, including work in Whitehouse, Forney, and Texarkana. Nearby businesses at this address include Capital Plaza, Embassy Suites by Hilton Austin Central, and Target.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78751 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Airport Boulevard: Segment C1A from 45th St. to 55th St. is a New Construction project located at 4511 to 5621 Airport Blvd., Austin, TX 78751 in Austin, Texas. The project has an estimated value of $13.4M covering 850,210 sq ft. City of Austin is the property owner and Halff Associates, Inc. is the design firm of record. The project was registered with TDLR on March 20, 2023.

Frequently Asked Questions

What is the estimated cost of this project?

The estimated cost for the Airport Boulevard segment from 45th to 55th Street is $13,405,550. This figure is recorded in the TDLR filing for the new construction work.

Who is the owner of the project?

The City of Austin is the owner of record for this project. Halff Associates, Inc. is listed as the design firm of record for the roadway improvements.

What is the current status of the construction?

The project was registered in March 2023 with a target completion of September 2024. No plan review or inspection has been recorded, so the final status is not confirmed in the public record.

Where exactly is this project located?

The project is located at 4511 to 5621 Airport Blvd. in Austin, TX 78751. It is situated in the Windsor Park neighborhood of Travis County.

What specific work is included in the scope?

The scope includes intersection improvements, access management, drainage upgrades, water and wastewater relocation, traffic signal upgrades, pedestrian hybrid beacons, median installation, shared use paths, and bike lanes.

What is Airport Boulevard: Segment C1A from 45th St. to 55th St.?

Airport Boulevard: Segment C1A from 45th St. to 55th St. is a new construction project at 4511 to 5621 Airport Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Includes intersection imp., extensive access management implementation, drainage upgrades/mods, water/wastewater relocation, traffic signal upgrades/adjustments, ped. hybrid beacons, median installation, shared use paths, bike lanes & pa…

Is Airport Boulevard: Segment C1A from 45th St. to 55th St. open in Austin?

Airport Boulevard: Segment C1A from 45th St. to 55th St. was scheduled to finish construction in Sep 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Airport Boulevard: Segment C1A from 45th St. to 55th St. located?

Airport Boulevard: Segment C1A from 45th St. to 55th St. is located at 4511 to 5621 Airport Blvd., Austin, TX, 78751, in Travis County.

Who is the owner or developer of Airport Boulevard: Segment C1A from 45th St. to 55th St.?

City of Austin is the property owner/developer of record for Airport Boulevard: Segment C1A from 45th St. to 55th St., per its TDLR project registration.

Who is the architect or design firm for Airport Boulevard: Segment C1A from 45th St. to 55th St.?

Halff Associates, Inc. is the design firm of record for Airport Boulevard: Segment C1A from 45th St. to 55th St., according to its TDLR filing.

How much does Airport Boulevard: Segment C1A from 45th St. to 55th St. cost and how big is it?

Airport Boulevard: Segment C1A from 45th St. to 55th St. has an estimated construction value of $13.4M and approximately 850,210 square feet (about $16/sqft), based on its TDLR filing.

Scope of Work

Includes intersection imp., extensive access management implementation, drainage upgrades/mods, water/wastewater relocation, traffic signal upgrades/adjustments, ped. hybrid beacons, median installation, shared use paths, bike lanes & pavement imp.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4511 to 5621 Airport Blvd., Austin, TX, 78751

Location by street address

Related City Permits

Building permits found at or near this location

4511 HANK AVE

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutAug 2026
View Details
2026-109292 MP
SERVICE WIZARD LLC
4511 AVENUE C

Demo of 35 ft of sidewalk in front of 4511 Ave C. No right of way will be affected there is no sidewalk on either adjacent lot.

FinalDriveway / SidewalksDemoAug 2026
View Details
2026-014225 DS
4511 TURNSTONE DR

Express: Tub-to-shower conversion in hallway bathroom; replace shower walls. Replace HVAC system. Replace 120sqft of Decking and roof shingles

FinalMechanical PermitRepairJul 2026
View Details
2026-091140 MP
ATX Clima LLC
4511 TURNSTONE DR

Express: Tub-to-shower conversion in hallway bathroom; replace shower walls. Replace HVAC system. Replace 120sqft of Decking and roof shingles

FinalPlumbing PermitRepairJul 2026
View Details
2026-091140 PP
Lugo's Plumbing Service
4511 TURNSTONE DR

Express: Tub-to-shower conversion in hallway bathroom; replace shower walls. Replace HVAC system. Replace 120sqft of Decking and roof shingles

FinalBuilding PermitRepairJul 2026
$1
View Details
2026-091140 BP
Wheels on Texas

Watch all construction in 78751 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.