Mueller - Control Tower Park
๐Project Metrics
TDLR #TABS2024001024Project Closed
Project has been completed and closed
๐Scope of Work
Control Tower Park is a 1.1 acre park in Mueller Tower District. The park has two berms & elevated accessible path connecting the two berms to view the tower. Shaded pathways, large berms w/ native planting, integrated seating, and overlooks.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$45.4M total๐๏ธSame Design Firm
$5.2M total๐Related City Permits
Building permits found at or near this location
Excavate 15 tunnel to repair main drain line serving kitchen
Replacement of complete existing central heat and air system with or without duct work
Express: Foundation repair
Disassemble and remove leaking gas line and Install a new gas line with adapters
Remodel and Repair Existing Control Tower