Lakeline Boulevard
Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln), Austin, TX, 78717
Lakeline Boulevard is a new construction project at Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln), Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2029. The project has an estimated value of $24.0M across about 1 sq ft.
- Estimated project value
- $24.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $24000.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
872 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
669 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78717 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Lakeline Boulevard is a New Construction project located at Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln), Austin, TX 78717 in Austin, Texas. The project has an estimated value of $24.0M covering 1 sq ft. City of Austin is the property owner and BinkleyBarfield/DCCM is the design firm of record. The project was registered with TDLR on April 11, 2025.
Frequently Asked Questions
What is Lakeline Boulevard?
Lakeline Boulevard is a new construction project at Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln) in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of widening roadway including a new shared used path and intersection improvements.
Is Lakeline Boulevard open in Austin?
Lakeline Boulevard is still under construction in Austin, TX, with an estimated completion of Jun 2029 according to its TDLR registration.
Where is Lakeline Boulevard located?
Lakeline Boulevard is located at Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln), Austin, TX, 78717, in Travis County.
Who is the owner or developer of Lakeline Boulevard?
City of Austin is the property owner/developer of record for Lakeline Boulevard, per its TDLR project registration.
Who is the architect or design firm for Lakeline Boulevard?
BinkleyBarfield/DCCM is the design firm of record for Lakeline Boulevard, according to its TDLR filing.
How much does Lakeline Boulevard cost and how big is it?
Lakeline Boulevard has an estimated construction value of $24.0M and approximately 1 square feet (about $24000.00K/sqft), based on its TDLR filing.
Scope of Work
Construction of widening roadway including a new shared used path and intersection improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Lyndhurst St/Staked Plains Dr to FM734 (Parmer Ln), Austin, TX, 78717
Watch all construction in 78717 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.