Project intelligenceTDLR TABS2025014769New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

AUS WEST GARAGE in Austin, TX

2921-1/2 Presidential Blvde, Austin, TX, 78617

Target date passed (Apr 2026)Review Complete

AUS WEST GARAGE is a new construction project at 2921-1/2 Presidential Blvde, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $240.0M across about 2,500,000 sq ft.

Estimated project value
$240.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,500,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$96/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 2, 2024485 days across supplied datesApr 1, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    109 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    376 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About AUS WEST GARAGE

The AUS West Garage is a new 7-level cast-in-place concrete structure designed to provide 7,000 parking spaces in Austin's Bergstrom neighborhood. The project is located at 2921-1/2 Presidential Blvde, Austin, TX 78617, and is registered with the Texas Department of Licensing and Regulation (TDLR). The City of Austin is the owner of record for this significant infrastructure development.

With an estimated cost of $240,000,000 and a total size of 2,500,000 sq ft, the garage represents a major investment in local transportation capacity. The design firm of record is Pgal, which has been involved in various construction projects across the state. The registered accessibility specialist for the project is Attila Huszka. The project involves public funds and public land, reflecting its role in the city's broader infrastructure goals.

Construction Timeline and Status

Construction was scheduled to begin in December 2024, and the completion date on the filing is April 2026. However, TDLR completed plan review in March 2025 and has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The TDLR status is listed as Review Complete. This project involves public funds and public land, reflecting its role in the city's broader infrastructure goals.

In comparison to other new construction projects in Travis County, the cost of the AUS West Garage is above the county median for its type, placing it in the top quarter of filings. The scheduled build window of 485 days is longer than the county median of 304 days. The cost per square foot is $96, which is below the county median of $125. These figures highlight the project's scale and complexity relative to other developments in the area.

The City of Austin has six other TDLR-registered projects, totaling $13,926,423, including the Austin-Bergstrom International Airport and various street improvements. Pgal, the design firm, has six other TDLR-registered projects totaling $34,850,000, with a mix of review complete and registered statuses. The area surrounding the garage includes other registered projects such as Met Center Building 2 and Met Tech Center, indicating a hub of construction activity in the Bergstrom neighborhood.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78617 (Austin)

One email per change. Unsubscribe in one click. Privacy.

AUS WEST GARAGE is a New Construction project located at 2921-1/2 Presidential Blvde, Austin, TX 78617 in Austin, Texas. The project has an estimated value of $240.0M covering 2,500,000 sq ft. City of Austin is the property owner and PGAL is the design firm of record. The project was registered with TDLR on March 21, 2025.

Frequently Asked Questions

Is the AUS West Garage open for use?

TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The completion date on the filing is April 2026, but no final inspection has been recorded.

Who is the owner of the AUS West Garage?

The City of Austin is the owner of record for the AUS West Garage, located at 2921-1/2 Presidential Blvde, Austin, TX 78617.

How many parking spaces will the garage have?

The AUS West Garage is designed to provide 7,000 parking spaces across 7 levels of cast-in-place concrete.

What is the estimated cost of the project?

The estimated cost of the AUS West Garage is $240,000,000, with a total size of 2,500,000 sq ft.

Who is the design firm for the garage?

The design firm of record for the AUS West Garage is Pgal, which has been involved in various construction projects across the state.

What is AUS WEST GARAGE?

AUS WEST GARAGE is a new construction project at 2921-1/2 Presidential Blvde in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 7 level cast-in-place concrete, 7,000 space parking garage.

Is AUS WEST GARAGE open in Austin?

AUS WEST GARAGE was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is AUS WEST GARAGE located?

AUS WEST GARAGE is located at 2921-1/2 Presidential Blvde, Austin, TX, 78617, in Travis County.

Who is the owner or developer of AUS WEST GARAGE?

City of Austin is the property owner/developer of record for AUS WEST GARAGE, per its TDLR project registration.

Who is the architect or design firm for AUS WEST GARAGE?

PGAL is the design firm of record for AUS WEST GARAGE, according to its TDLR filing.

How much does AUS WEST GARAGE cost and how big is it?

AUS WEST GARAGE has an estimated construction value of $240.0M and approximately 2,500,000 square feet (about $96/sqft), based on its TDLR filing.

Scope of Work

New 7 level cast-in-place concrete, 7,000 space parking garage.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2921-1/2 Presidential Blvde, Austin, TX, 78617

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78617 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.