Final inspection completed, awaiting project closure
Port 10 ZXP is a Renovation/Alteration project located at 2650 E IH 10 Suite 100, Baytown, TX 77521 in Baytown, Texas. The project has an estimated value of $815K covering 917 sq ft. Port 10 Intermodal, LLC is the property owner and Powers Brown Architecture is the design firm of record. The project was registered with TDLR on November 25, 2025.
Port 10 ZXP is a renovation/alteration project at 2650 E IH 10 Suite 100, Baytown, TX 77521 in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THIS PROJECT INCLUDES PALLET STORAGE ON PALLETS ON THE FLOOR (NOT TO EXCEED 6') OF AUTOMOTIVE MOTOR OILS (NON-HAZ MAT. NON FLAMMABLE PETROLEUM LUBRICANTS --SDS ATTACHED). ADDITIONAL SCOPE INCLUDES THE INSTALLATION OF (16) DOCK LEVELERS,โฆ
Construction on Port 10 ZXP is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Port 10 ZXP is located at 2650 E IH 10 Suite 100, Baytown, TX 77521, Baytown, TX, 77521, in Harris County.
Port 10 Intermodal, LLC is the property owner/developer of record for Port 10 ZXP, per its TDLR project registration.
Powers Brown Architecture is the design firm of record for Port 10 ZXP, according to its TDLR filing.
Port 10 ZXP has an estimated construction value of $815K and approximately 917 square feet (about $889/sqft), based on its TDLR filing.
THIS PROJECT INCLUDES PALLET STORAGE ON PALLETS ON THE FLOOR (NOT TO EXCEED 6') OF AUTOMOTIVE MOTOR OILS (NON-HAZ MAT. NON FLAMMABLE PETROLEUM LUBRICANTS --SDS ATTACHED). ADDITIONAL SCOPE INCLUDES THE INSTALLATION OF (16) DOCK LEVELERS, (4) HVLS FANS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 25, 2025
Review Complete
Dec 13, 2025
Inspection Complete
May 21, 2026
Closed
18d
Review duration
159d
Construction phase