RIVER SING
RIVER SING is a renovation/alteration project at 820 EXPOSITION AVE, SUITE 1, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.4M across about 4,456 sq ft.
๐Project Metrics
TDLR #TABS2026007709Review Complete
Design review complete, construction may proceed
RIVER SING is a Renovation/Alteration project located at 820 EXPOSITION AVE, SUITE 1, Dallas, TX 75226 in Dallas, Texas. The project has an estimated value of $1.4M covering 4,456 sq ft. EXPO PARK BLOCK 811 LLC is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on December 10, 2025.
โFrequently Asked Questions
What is RIVER SING?
RIVER SING is a renovation/alteration project at 820 EXPOSITION AVE, SUITE 1 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONVERSION OF AN EXISTING INDUSTRIAL BUILDING INTO A RESTAURANT WITH ATTACHED GARDEN AREA IN FORMER GARAGE SPACE
Is RIVER SING open in Dallas?
RIVER SING is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is RIVER SING located?
RIVER SING is located at 820 EXPOSITION AVE, SUITE 1, Dallas, TX, 75226, in Dallas County.
Who is the owner or developer of RIVER SING?
EXPO PARK BLOCK 811 LLC is the property owner/developer of record for RIVER SING, per its TDLR project registration.
Who is the architect or design firm for RIVER SING?
ENTOS DESIGN is the design firm of record for RIVER SING, according to its TDLR filing.
How much does RIVER SING cost and how big is it?
RIVER SING has an estimated construction value of $1.4M and approximately 4,456 square feet (about $314/sqft), based on its TDLR filing.
๐Scope of Work
CONVERSION OF AN EXISTING INDUSTRIAL BUILDING INTO A RESTAURANT WITH ATTACHED GARDEN AREA IN FORMER GARAGE SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 10, 2025
Review Complete
Dec 10, 2025
Inspection Complete
Closed