Middle Group Foods Expansion
Middle Group Foods Expansion is a renovation/alteration project at 229 Stream Way Bldg. 5, Buda, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $600K across about 53,212 sq ft.
๐Project Metrics
TDLR #TABS2026009320Review Complete
Design review complete, construction may proceed
Middle Group Foods Expansion is a Renovation/Alteration project located at 229 Stream Way Bldg. 5, Buda, TX 78610 in Buda, Texas. The project has an estimated value of $600K covering 53,212 sq ft. Buda Commerce Holdings is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on January 6, 2026.
โFrequently Asked Questions
What is Middle Group Foods Expansion?
Middle Group Foods Expansion is a renovation/alteration project at 229 Stream Way Bldg. 5 in Buda, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: adding a demising wall and small office pod to expand tenants square footage in a previously permitted warehouse / office space.
Is Middle Group Foods Expansion open in Buda?
Middle Group Foods Expansion is currently under construction in Buda, TX. Its current TDLR status is "Review Complete".
Where is Middle Group Foods Expansion located?
Middle Group Foods Expansion is located at 229 Stream Way Bldg. 5, Buda, TX, 78610, in Hays County.
Who is the owner or developer of Middle Group Foods Expansion?
Buda Commerce Holdings is the property owner/developer of record for Middle Group Foods Expansion, per its TDLR project registration.
Who is the architect or design firm for Middle Group Foods Expansion?
S. Tipton Studio is the design firm of record for Middle Group Foods Expansion, according to its TDLR filing.
How much does Middle Group Foods Expansion cost and how big is it?
Middle Group Foods Expansion has an estimated construction value of $600K and approximately 53,212 square feet (about $11/sqft), based on its TDLR filing.
๐Scope of Work
adding a demising wall and small office pod to expand tenants square footage in a previously permitted warehouse / office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 6, 2026
Review Complete
Feb 8, 2026
Inspection Complete
Closed
33d
Review duration
๐Related Projects
๐๏ธSame Design Firm
$164.9M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater INSTALL 50GAL WATER HEATER
ETJ disconnect/reconnect services to install ATS for generator. This project involves coordinating with Austin Energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a Kohler 26kW standby generators automatic transfer switch (ATS) to the residential electrical service. No new meter is being installed and the generator installation itself has been separately permitted and inspected through the City of Lakeway. This permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ATS. The scope of work includes coordinating with Austin Energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ATS and reinstalling the existing meter upon completion. No service upgrade meter base replacement or structural modifications are included. All work will be performed in compliance with applicable codes and safety standards.
Service only upgrade from 200amp underground to 225amp
Install circuit for EV car charger outdoors
install irrigation system