MEI is a renovation/alteration project at 6719 E Howard Ln Bldg. 3 Suite 301, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $600K across about 195,774 sq ft.
Design review complete, construction may proceed
MEI is a Renovation/Alteration project located at 6719 E Howard Ln Bldg. 3 Suite 301, Austin, TX 78653 in Austin, Texas. The project has an estimated value of $600K covering 195,774 sq ft. Howard 130 Logistics Holdings is the property owner and S. Tipton Studio is the design firm of record. The project was registered with TDLR on January 7, 2026.
MEI is a renovation/alteration project at 6719 E Howard Ln Bldg. 3 Suite 301 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New full height wall to split HVAC half of building from non-HVAC half of building to a previously permitted shell warehouse building.
MEI is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
MEI is located at 6719 E Howard Ln Bldg. 3 Suite 301, Austin, TX, 78653, in Travis County.
Howard 130 Logistics Holdings is the property owner/developer of record for MEI, per its TDLR project registration.
S. Tipton Studio is the design firm of record for MEI, according to its TDLR filing.
MEI has an estimated construction value of $600K and approximately 195,774 square feet (about $3/sqft), based on its TDLR filing.
New full height wall to split HVAC half of building from non-HVAC half of building to a previously permitted shell warehouse building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 7, 2026
Review Complete
Feb 8, 2026
Inspection Complete
Closed
32d
Review duration
Building permits found at or near this location
15 DAY - New full height wall to split HVAC half of building from non HVAC half. Exterior ramp stairs and fence. Racking is NOT part of this permit will be done with another permit. NO access control.
15 DAY - New full height wall to split HVAC half of building from non HVAC half. Exterior ramp stairs and fence. Racking is NOT part of this permit will be done with another permit. NO access control. Per AEDCM 1.3.3 As a standard service AE supplies one point of service at one service voltage to a single building or point of service located on a single lot or tract of land. The riser diagram shows 2 points of service. This is permissible per Robert Ruiz. 5-27-26.
Replacement of an existing water heater new rheem 50 gallon propane tank water heater change out 6719 Cuesta Trail Austin TX 78730
15 DAY - New full height wall to split HVAC half of building from non HVAC half. Exterior ramp stairs and fence. Racking is NOT part of this permit will be done with another permit. NO access control.
Request for CO no construction proposed. Previously approved 2023-073783 PR included office finish out and MEP Construction with COM Checks. NO changes proposed occupancy requested as-is condition. No access Control. No MEP Scope.