9th Floor Corridor
9th Floor Corridor is a renovation/alteration project at 2323 Cedar Springs Road Suite 1425, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $167K across about 2,269 sq ft.
๐Project Metrics
TDLR #TABS2026010812Project Registered
Project has been registered with TDLR and is in pre-construction phase
9th Floor Corridor is a Renovation/Alteration project located at 2323 Cedar Springs Road Suite 1425, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $167K covering 2,269 sq ft. 23 Springs LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on January 25, 2026.
โFrequently Asked Questions
What is 9th Floor Corridor?
9th Floor Corridor is a renovation/alteration project at 2323 Cedar Springs Road Suite 1425 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,269 SF
Is 9th Floor Corridor open in Dallas?
9th Floor Corridor is currently under construction in Dallas, TX. Its current TDLR status is "Project Registered".
Where is 9th Floor Corridor located?
9th Floor Corridor is located at 2323 Cedar Springs Road Suite 1425, Dallas, TX, 75201, in Dallas County.
Who is the owner or developer of 9th Floor Corridor?
23 Springs LP is the property owner/developer of record for 9th Floor Corridor, per its TDLR project registration.
Who is the architect or design firm for 9th Floor Corridor?
Entos Design is the design firm of record for 9th Floor Corridor, according to its TDLR filing.
How much does 9th Floor Corridor cost and how big is it?
9th Floor Corridor has an estimated construction value of $167K and approximately 2,269 square feet (about $74/sqft), based on its TDLR filing.
๐Scope of Work
2,269 SF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 25, 2026
Review Complete
Inspection Complete
Closed