Wireless Zone
Wireless Zone is a renovation/alteration project at 3000 Washington Drive Suite 500, Melissa, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $150K across about 933 sq ft.
๐Project Metrics
TDLR #TABS2026011500Inspection Complete
Final inspection completed, awaiting project closure
Wireless Zone is a Renovation/Alteration project located at 3000 Washington Drive Suite 500, Melissa, TX 75454 in Melissa, Texas. The project has an estimated value of $150K covering 933 sq ft. Cougar Commercial, LLC is the property owner and Studio M Architecture is the design firm of record. The project was registered with TDLR on February 2, 2026.
โFrequently Asked Questions
What is Wireless Zone?
Wireless Zone is a renovation/alteration project at 3000 Washington Drive Suite 500 in Melissa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Tenant Improvements to a Vacant 933 sf space, First Tenant Build-out of space; Elec, HVAC, Sewer/Watter within space
Is Wireless Zone open in Melissa?
Construction on Wireless Zone is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Wireless Zone located?
Wireless Zone is located at 3000 Washington Drive Suite 500, Melissa, TX, 75454, in Collin County.
Who is the owner or developer of Wireless Zone?
Cougar Commercial, LLC is the property owner/developer of record for Wireless Zone, per its TDLR project registration.
Who is the architect or design firm for Wireless Zone?
Studio M Architecture is the design firm of record for Wireless Zone, according to its TDLR filing.
How much does Wireless Zone cost and how big is it?
Wireless Zone has an estimated construction value of $150K and approximately 933 square feet (about $161/sqft), based on its TDLR filing.
๐Scope of Work
Interior Tenant Improvements to a Vacant 933 sf space, First Tenant Build-out of space; Elec, HVAC, Sewer/Watter within space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 2, 2026
Review Complete
May 3, 2026
Inspection Complete
Jun 27, 2026
Closed
90d
Review duration
55d
Construction phase