Neches FCU
Neches FCU is a new construction project at 135 HWY 327 E., Silsbee, in Hardin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $183K across about 270 sq ft.
๐Project Metrics
TDLR #TABS2026014011Review Complete
Design review complete, construction may proceed
Neches FCU is a New Construction project located at 135 HWY 327 E., Silsbee, TX 77630 in Silsbee, Texas. The project has an estimated value of $183K covering 270 sq ft. Neches FCU is the property owner and SLI Group Inc. is the design firm of record. The project was registered with TDLR on March 3, 2026.
โFrequently Asked Questions
What is Neches FCU?
Neches FCU is a new construction project at 135 HWY 327 E. in Silsbee, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: COMPLETE INSTALLATION OF A SINGLE DRIVE THRU LANE ITM KIOSK INCLUDING SITEWORK, PAVING, AND SITE LIGHTING.
Is Neches FCU open in Silsbee?
Neches FCU is still under construction in Silsbee, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Neches FCU located?
Neches FCU is located at 135 HWY 327 E., Silsbee, TX, 77630, in Hardin County.
Who is the owner or developer of Neches FCU?
Neches FCU is the property owner/developer of record for Neches FCU, per its TDLR project registration.
Who is the architect or design firm for Neches FCU?
SLI Group Inc. is the design firm of record for Neches FCU, according to its TDLR filing.
How much does Neches FCU cost and how big is it?
Neches FCU has an estimated construction value of $183K and approximately 270 square feet (about $678/sqft), based on its TDLR filing.
๐Scope of Work
COMPLETE INSTALLATION OF A SINGLE DRIVE THRU LANE ITM KIOSK INCLUDING SITEWORK, PAVING, AND SITE LIGHTING.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 3, 2026
Review Complete
Mar 13, 2026
Inspection Complete
Closed
10d
Review duration
๐Related Projects
๐คSame Owner
$954K total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hardin County
Find General Contractors in Hardin