Property Owner7 not closed in shown records

Neches FCU

PO Box 1118, Port Neches, Texas 77651
Vickie Conkle

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 9 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

9
Total Projects
$7.5M
Portfolio Value
7
Not closed · shown
10,845
Sq ft · shown
6
Cities · shown
$829K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Neches FCU files a new project.

Export full work history

Download Neches FCU's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Neches FCU

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Neches FCU

Neches FCU is named as an owner in 9 construction filings in the Beaumont-Port Arthur area, with a reported portfolio value of $7.5M. The 9 loaded filings include 6 new construction records and 1 renovation/alteration records, representing 10,845 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 6 new construction projects (67%)
  • 1 renovation projects (11%)
  • Average disclosed value in shown filings: $829K
  • Square footage in shown records: 10,845 sq ft

Market Presence

  • Lumberton3 projects
  • Beaumont2 projects
  • Silsbee1 projects
  • N ORANGE1 projects

Among these 9 loaded filings, 7 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 6 cities and name design firms including SLI Group Inc., SLI Group, Inc., SLI Group Inc. These are filing statuses, not independent observations of work on site.

Activity Over Time

2023
1
2024
1
2025
3
2026
4
Median project: $216KAvg cost/sqft: $5,502/sqftPeak year: 2026 (4 projects)

Activity Timeline

First Project
Oct 2023
Latest Project
Apr 2026
7
Not closed
2
Source closed

Project Status

Review Complete
6(67%)
Closed
2(22%)
Registered
1(11%)