AIRTRON
AIRTRON is a renovation/alteration project at 14785 PRESTON RD. SUITE 1000N, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $125K across about 12,660 sq ft.
๐Project Metrics
TDLR #TABS2026014170Review Complete
Design review complete, construction may proceed
AIRTRON is a Renovation/Alteration project located at 14785 PRESTON RD. SUITE 1000N, Dallas, TX 75254 in Dallas, Texas. The project has an estimated value of $125K covering 12,660 sq ft. SIGNATURE EXCHANGE PROPERTY OWNER, LLC is the property owner and idGROUP is the design firm of record. The project was registered with TDLR on March 4, 2026.
โFrequently Asked Questions
What is AIRTRON?
AIRTRON is a renovation/alteration project at 14785 PRESTON RD. SUITE 1000N in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NON-STRUCTURAL INTERIOR FINISH-OUT IN AN EXISTING SINGLE FLOOR SUITE. INCLUDES HVAC & ELECTRICAL.
Is AIRTRON open in Dallas?
AIRTRON is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is AIRTRON located?
AIRTRON is located at 14785 PRESTON RD. SUITE 1000N, Dallas, TX, 75254, in Dallas County.
Who is the owner or developer of AIRTRON?
SIGNATURE EXCHANGE PROPERTY OWNER, LLC is the property owner/developer of record for AIRTRON, per its TDLR project registration.
Who is the architect or design firm for AIRTRON?
idGROUP is the design firm of record for AIRTRON, according to its TDLR filing.
How much does AIRTRON cost and how big is it?
AIRTRON has an estimated construction value of $125K and approximately 12,660 square feet (about $10/sqft), based on its TDLR filing.
๐Scope of Work
NON-STRUCTURAL INTERIOR FINISH-OUT IN AN EXISTING SINGLE FLOOR SUITE. INCLUDES HVAC & ELECTRICAL.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2026
Review Complete
Apr 5, 2026
Inspection Complete
Closed
32d
Review duration